A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects

Author:

Koo ChoongWan1,Hong TaeHoon1,Hyun ChangTaek1,Koo KyoJin1

Affiliation:

1. Department of Architectural Engineering, University of Seoul, Seoul, Korea.

Abstract

Decision-making in the early stage of a project has a significant impact on the project. However, limited and uncertain information on the project and a complex correlation among various factors that affect the project’s construction duration and cost, make it difficult to predict and manage the project. Therefore, this study developed a case-based reasoning (CBR)-based hybrid model with which to predict the construction duration and cost of a project in its early stage. One hundred and one cases among multi-family housing projects that were completed between 2000 and 2005 were used. The CBR-based hybrid model developed in this study is the result of integrating the advantages of (i) prediction methodologies, such as case-based reasoning, multiple regression analysis, and artificial neural networks, (ii) the optimization process using a genetic algorithm, and (iii) the probability distribution and the analysis process of outlier using Monte-Carlo simulation. The results of this study are expected to support the owners and managers who are in charge of estimating budget and construction duration in both public and private sectors, in predicting accurately the construction duration and cost at the business planning or early stage of a project.

Publisher

Canadian Science Publishing

Subject

General Environmental Science,Civil and Structural Engineering

Reference20 articles.

1. Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression

2. Performance Measurement in Construction

3. Construction Industry Institute (CII). 1998b. Project delivery systems: CM at risk, design-build, design-bid-build. Research Report 133, Univ. of Texas, Austin, TX.

4. Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems

5. Donald, S.B., and Boyd, C.P. 1992. Professional construction management including C. M., design-construction, and general contracting. 3rd ed. McGraw-Hill, New York.

Cited by 88 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3