1. Ahren, M.D., and Simpson, R.C. 2000a. Final report on drilled shaft load testing (Osterberg method). Test shaft MP-1 – Cooper River Bridge, Mt. Pleasant, S.C. Project LT-8650-1. Prepared by Loadtest Incorporation for Trevi Icos Corporation.
2. Ahren, M.D., and Simpson, R.C. 2000b. Final report on drilled shaft load testing (Osterberg method). Test shaft MP-2 – Cooper River Bridge, Mt. Pleasant, S.C. Project LT-8650-2. Prepared by Loadtest Incorporation for Trevi Icos Corporation.
3. Ahren, M.D., Simpson, R.C., and Hayes, J.A. 2000a. Final report on drilled shaft load testing (Osterberg method). Test shaft C-1 – Cooper River Bridge, Charleston, S.C. Project LT-8650-6. Prepared by Loadtest Incorporation for Trevi Icos Corporation.
4. Ahren, M.D., Simpson, R.C., and Hayes, J.A. 2000b. Final report on drilled shaft load testing (Osterberg method). Test shaft C-2 – Cooper River Bridge, Charleston, SC. Project LT-8650-7. Prepared by LoadTest Incorporation for Trevi Icos Corporation.
5. Ahren, M.D., Simpson, R.C., and Hayes, J.A. 2000c. Final report on drilled shaft load testing (Osterberg method). Test shaft MP-3 – Cooper River Bridge, Mt. Pleasant, S.C. Project LT-8650-3. Prepared by Loadtest Incorporation for Trevi Icos Corporation.