Affiliation:
1. Civil Engineering Department College of Engineering & Petroleum Kuwait University, P.O. Box 5969 Kuwait
Abstract
The time delay between measuring the structural response, and applying the designed active control forces may affect the controlled response of the structure if not taken into consideration. In this paper it is shown how to design the control forces to compensate for the delay effect. It is also shown that the time delay effect can be used as a criterion to judge the effectiveness of the proposed control mechanism. As an illustration of the theoretical consideration, a numerical example in which a tall building is controlled by means of active tendons is presented.
Publisher
Canadian Science Publishing
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献