Affiliation:
1. Universidade Estadual do Centro Oeste (UNICENTRO), Irati, Paraná, Brazil.
2. Universidade Federal do Parana (UFPR), Curitiba, Paraná, Brazil.
Abstract
Machine availability and timber harvest productivity in commercial forestry are influenced in part by operator performance. This work aimed to evaluate the behavior of these two variables, machine availability and productivity, during the training period for harvester operators. The study was conducted at a forestry company situated in Brazil. Productivity and machine availability data were collected for 30 individuals who were trained over an 11-month period. Monthly mean data for both variables were compared using Tukey’s test. The analysis revealed a significant difference in productivity and machine availability during the training period, with productivity increasing until 6 months of harvester operator training while machine availability simultaneously decreased. Productivity began at a mean of 9 m3·PMH0 −1, reaching 24 m3·PMH0 −1 at its peak, and stabilizing around 20 m3·PMH0 −1, where PMH0 is productive machine hours. Machine availability started at 84%, decreased to a mean of 78%, and increased to around 88% until the present. Both variables demonstrated a tendency toward stabilization until 9 months of harvester operation training. Given that the harvester operator training period had a significant influence on machine availability and productivity, this study’s results support careful operational planning, staffing, and resource use during this training period.
Publisher
Canadian Science Publishing
Subject
Ecology,Forestry,Global and Planetary Change
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献