Author:
Eldin Neil N.,Senouci Ahmed B.
Abstract
A two-state-variable, N-stage dynamic programming approach to scheduling and control of linear projects is presented. This approach accounts for practical considerations related to work continuity, interruptions, and lags between successive activities. In the dynamic programming formulation, stages represent project activities and state variables represent possible activity resources and interruptions at each location. The objective of the dynamic programming solution is to provide for the selection of resources, interruptions, and lags for production activities that lead to the minimum project total cost. In addition, the presented system produces a graphical presentation of the optimum project schedule and updates the original schedule based on update information input by the user. The updated schedule determines the new completion date, and forecasts the project new total cost based on the current project performance. A small linear project is provided as a numerical illustration of the system. Key words: dynamic programming, linear projects, scheduling systems, optimization of cost and scheduling durations.
Publisher
Canadian Science Publishing
Subject
General Environmental Science,Civil and Structural Engineering
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献