Optimized material management in construction using multi-layer perceptron

Author:

Golkhoo Farzaneh11,Moselhi Osama11

Affiliation:

1. Department of Building, Civil and Environmental Engineering, Concordia University, Sir George Williams Campus, 1455 De Maisonneuve Blvd. W., Montreal, QC H3G 1M8, Canada.

Abstract

Construction material represents a major component of the project cost. Therefore, it is essential to control material on construction job sites. Efficient material management system requires trade-offs and optimized balance among elements of material cost including purchase cost, storage cost, opportunity cost, ordering cost, and unavailability cost. Thus, there is a need to develop an automated method for optimizing the delivery and inventory of construction materials not only in the planning phase but also in the construction phase to account for introduced changes. In this research a novel genetic algorithm – multi-layer perceptron (GA-MLP) method is proposed to generate optimized material delivery schedule. Multi-layer perceptron (MLP) is utilized to improve genetic algorithm (GA) by generating memory to overcome local minima encountered in applying GA for optimization. This automated method supports contractors to buy construction materials with the least cost and without leading to material shortage or surplus. The proposed automated method has been validated through a numerical example. The obtained results demonstrate that GA-MLP outperform GA in optimizing construction material inventory.

Publisher

Canadian Science Publishing

Subject

General Environmental Science,Civil and Structural Engineering

Reference35 articles.

1. Optimising material procurement for construction waste minimization: An exploration of success factors

2. Alanjari, P., Razavialavi, S., and Abourizk, S. 2014. Material and facility layout planning in construction projects using simulation. In Simulation Conference (WSC), Savanah, GA, USA, 7–10 December 2014, pp. 3388–3398. 10.1109/WSC.2014.7020172.

3. Measuring Effectiveness of Materials Management for Industrial Projects

4. Barry, W., Leite, F., and O’Brien, W. 2014. Identification of late deliverables and their true effects on industrial construction projects. In Construction Research Congress, Atlanta, Georgia, May 19–21, 2014, pp. 2296–2305. 10.1061/9780784413517.233.

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3