Abstract
For tunnelling in urban areas, the current sequential excavation (SE) method usually increases the number of temporary drifts to achieve better control of surface settlements, which may prolong construction duration. In this case study, a four-drift SE method, termed the suspension-type centre cross diaphragm (S-CRD) method, was proposed and applied to the construction of a large cross-section tunnel in soft ground, where normally the six-drift double-side drift (DSD) method would be adopted. Field monitoring results and statistical data indicated that, in comparison with the six-drift DSD method, the four-drift S-CRD method achieved better control of the surface settlements while improving the efficiency of construction by 30%. The advantages of the S-CRD method, i.e., safe and rapid construction, were eminently clear.
Publisher
Canadian Science Publishing
Subject
Civil and Structural Engineering,Geotechnical Engineering and Engineering Geology
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献