1. Chen Depeng, Qian Chunxiang, et al, (2007). Research on determination and calculation method of specific heat capacity of cement-based materials, Build mater, 2,29-35.
2. Cress,M.D.,(1995).Heated bridge deck construction and operation in Lincoln, Nebraska,IABSE Symp, San Francisco,pp,449-454.
3. Next Wave of Technology;Tesar;Intelligent Automation and Soft Computing,2016
4. Guo Zhenguo, De Ying, Huang Yufang, (2012). Heating cable in the driveway of snow melting ice application. Urban theory building (electronic version), 8, 50-57.
5. GAO Yiping, (1999). The system of deicing and melting snow on road surface by the solar energy, The foreign road, 17(4),853-859.