1. J. L. CREWS et al. “Loss of Residual Heat Removal System, Diablo Canyon, Unit 2, April 10,1987 (Augmented Inspection Team Report),” NUREG-1269, U.S. Nuclear Regulatory Commission (June 1991).
2. Core Boiling During Midloop Operation
3. T. S. ANDREYCHEK et al. “Loss of RHRS Cooling While the RCS is Partially Filled,” WCAP-11916, Westinghouse Electric Corporation (June 1988).
4. V. H. RANSOM et al. “RELAP5/MOD3 Code Manual,” Vols. 1 and 2, NUREG/CR-4312, EGG-2396, U.S. Nuclear Regulatory Commission (Aug. and Dec. 1985).