1. “Quick Look Inspection: Report on the Insertion of a Camera into the TMI-2 Reactor Vessel Through a Lead-screw Opening,” GEND-030, Vol. 1, EG&G Idaho, Inc. (Mar. 1983).
2. J. ADAMS and R. SMITH, “Lower Plenum Video Data Survey,” EGG-TMI-7429, EG&G Idaho, Inc. (July 1987).
3. E. L. TOLMAN, R. P. SMITH, M. R. MARTIN, R. K. McCARDELL and J. M. BROUGHTON, “TMI-2 Core Bore Acquisition Summary Report,” EGG-TMI-7385, Rev. 1, EG&G Idaho, Inc. (Feb. 1987).
4. K. VINJAMURI, D. W. AKERS and R. R. HOBBINS, “Examination of H8 and B8 Leadscrews from Three Mile Island Unit 2,” GEND-INF-052, EG&G Idaho, Inc. (Sep. 1985).
5. G. M. BAIN and G. O. HAYNER, “Initial Examination of the Surface Layer of a 9-Inch Leadscrew Section Removed from Three Mile Island-2,” EPRI-NP-3407, Electric Power Research Institute (Jan. 1984).