1. “Three-Dimensional BWR Core Simulation Method,” Nuclear Fuel Industries, Ltd., NLR-03 (Apr. 1994) (in Japanese).
2. “Core Management System for BWR Nuclear Power Plants,” Nuclear Fuel Industries, Ltd., NLR-20 (Mar. 1999) (in Japanese).
3. N. H. LARSEN, “Core Design and Operating Data for Cycle 1 and 2 of Peach Bottom 2,” EPRI NP-563, Electric Power Research Institute (June 1978).
4. L. A. CARMICHAEL and R. O. NIEMI, “Transient and Stability Tests at Peach Bottom Atomic Power Station Unit 2 at End of Cycle 2,” EPRI NP-564, Electric Power Research Institute (June 1978).
5. J. S. SOLIS et al. “Boiling Water Reactor Turbine Trip (TT) Benchmark Volume I: Final Specifications,” NEA/NSC/DOC(2001)1, Rev. 1, Nuclear Energy Agency (Oct. 2001).