1. “Potential for Degradation of the ECCS and the Containment Spray System after a LOCA because of Construction and Protective Coating Deficiencies and Foreign Material in Containment,” Generic Letter 98-04, U.S. Nuclear Regulatory Commission (July 1998).
2. “Potential Plugging of ECCS Strainers by Debris in BWRs,” Bulletin 96-03, U.S. Nuclear Regulatory Commission (May 1996).
3. D. V. RAO, “Drywell Debris Transport Study: Experimental Work,” NUREG/CR-6369, V2 (SEA 97-3105-A:15), U.S. Nuclear Regulatory Commission (Sep. 1999).
4. G. ZIGLER, “Parametric Study of the Potential for BWR ECCS Strainer Blockage due to LOCA Generated Debris,” NUREG/CR-6224 (SEA 93-554-06-A:1), U.S. Nuclear Regulatory Commission (Apr. 1995).
5. J. B. NYSTROM, “Evaluation of Transport Velocity for NUKON Insulation Base Wool at Elevated Temperature and Ph,” ARL-124-83/M398F, NUREG/CR-3616, Alden Research Laboratory (Jan. 1984).