Innovative and Collaborative Well Intervention Solution Restores Well Integrity to Compromised Completion

Author:

Mackenzie Gordon1,McLelland Alan1,Carragher Paul2,Fulks Jeff2,Mason David2

Affiliation:

1. IPI Packers

2. BiSN

Abstract

Abstract This Asia Pacific client's completion system had an integrity issue whereby the production packer installed in 1995 was not sealing the tubing to casing annulus. Being an older facility, the drilling substructure had previously been removed and a solution to restore production integrity using non-rig assist through tubing intervention technologies was required. The innovative solution developed and employed was to create an impermeable annular barrier directly above the compromised production packer seal, through the in-situ completion tubing utilizing an electric wireline set inflatable retrievable bridge plug system, for diversion, along with a bismuth-based metal-to-metal sealing alloy actuated by means of a thermite heater. This unique solution included drilling the tubing above the production packer with an e-line deployed system to provide multiple communication ports to the annulus, an e-line set inflatable retrievable bridge with a modified, extended fish neck was then set utilizing wellbore fluid as the inflation medium. The bismuth alloy metal sealing particulate (pellets) were positioned via a dump bailer above the inflatable plug which directed them to the tubing / casing annulus to gravitate to their position and calculated radial height within the compromised annulus. Once positioned the inflatable bridge plug was retrieved via slickline. An e-line conveyed thermite-based heater module was then deployed to complete the process of forming the bismuth-based alloy seal allowing for a permanent annular barrier to be created. Once accomplished and integrity confirmed a straddle/patch system was run to re-seal the tubing / casing annulus drilled holes, prior to the well-being returned to production. This paper will focus on this rigless intervention operation conducted in July 2021 as it relates primarily to the engineering and installation and retrieval of the bridge plugs and the development, engineering, and installation of the bismuth-based metal to metal sealing alloy, allowing repair to be completed and the well handed over in a position of full integrity.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3