Integrated Project Delivery: A Paradigm Shift for Oil and Gas Projects in the UAE and the Middle East Region

Author:

Al Subaih Adel1

Affiliation:

1. Abu Dhabi National Oil Company

Abstract

Summary In the BP Statistical Review of World Energy (BP 2014), it was cited that consumption and production have increased for oil and natural gas to record levels across the globe. In parallel, hydrocarbon companies have been ramping up spending to meet those capital needs. 2013 saw increased global energy consumption. Developing economies nonetheless strive to dominate global energy supply, accounting for 80% of growth last year and nearly 100% of growth over the past decade (BP 2014). Additionally, 89% of all oil and gas projects overshoot their original budget in the Middle East, 68% in Asia Pacific, and 67% in Africa (EY 2014). These figures are directly in proportion to projects that have schedule delays; as an example, 87% in the Middle East, 82% in Africa, and 80% in Asia Pacific. In relation to the size of cost overruns and scheduled delays, it was highlighted that 65% of the projects analyzed were facing cost overruns, with an average increase of 23% of the approved budget (EY 2014). In several papers, it was highlighted that typical oil and gas megaprojects were very expensive and very late in their delivery schedule (Merrow 2012). This means that they were late to produce revenues and compensate for losses. Worldwide, it was indicated that 40 to 50% of all construction projects are behind schedule, and one of the biggest costs impacting the projects is inefficiencies that are built into the project execution rather than the costs of raw materials, such as steel and concrete, or the cost of labor. Owners (sometimes also called clients) stated that they felt their project controls were unsatisfactory, quoting project-management teams and cost controls as the most critical requiring improvement (CMAA 2005). Limited studies and research were conducted within oil and gas construction to identify the factors causing delays, which had been predicted as dispute, arbitration, total abandonment, and litigation (Aibinu and Jagboro 2002). The delivery delay and cost overruns cause loss of wealth, time, and capacity, which results in income losses and unavailability of facilities for the owners. Loss of money is caused by extra spending on equipment and materials, hiring the labor, and loss of time for the contractor (Haseeb et al. 2011). Research conducted in the past verified that the project delivery system has a great impact on the project result. Findings from the research by Gaba (2013) indicated that design/bid/build (DBB) and design/build (DB) combinations are strongly related to high levels of effectiveness (i.e., project success), with the latter also positively related to quality outcomes of construction projects (Gaba 2013). As an example, of the 351 projects used for the study by Sanvido and Konchar (1999), the DB project-delivery system was delivered 33.5% faster and was 6.1% less expensive as compared with the DBB project-delivery method. The focus of this paper is how efficiencies affect schedule, with the recognition of the secondary effect on the project cost. This paper also proposes integrated project delivery as an effective project-delivery method for executing oil and gas projects with better performance expectations.

Publisher

Society of Petroleum Engineers (SPE)

Subject

General Medicine

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3