Affiliation:
1. Abu Dhabi Co. Onshore Oil Opn.
Abstract
Please note: The pdf file of this paper does not include Graph 1.
Abstract
Managing Sustainable Annulus Pressures (SAP) is one of major well's integrity challenges in the oil & gas industry as they pose an HSE concern.
As the wells ages, more wells do exhibit SAP of a varying degrees, some could be managed, and others should be dealt with on fast track basis & send to work over (if required).
The objective of this paper is to provide an overview of ADCO's initiatives in managing casing sustainable annuli pressure in ADCO field.
Since the introduction of ADCO SAP guidelines in June 2002, to manage casing annuli pressures and ensure the integrity of all wells during their life cycle, ADCO field embarked on an aggressive campaign to implement the guidelines and manage SAP wells effectively.
The paper sheds light on how the SAP wells are being managed, base line data collection, integration with PIES (Production Injection Export System), SAP current status (compared with that recorded in early 2003) and associated KPI's.
And finally touch on recommendations & way forward based on ADCO massive experience gained during the last 3 years to ensure the integrity of all ADCO wells.
I. ADCO Policy
ADCO's HSE Policy states: "It is the policy of ADCO to conduct its activities in such a way as to take foremost account of the health and safety of its employees and contractors, give proper regard to the conservation of the environment and impact to local communities".
ADCO will make continuous efforts to prevent all accidents and reduce environmental impacts and will design facilities, establish procedures and conduct operations in a manner that minimizes risks and hazards.
In dealing with surface casing annulus pressures, ADCO will:
"Manage surface casing annuli pressures and ensure the integrity of all wells during their life cycle".
During the last four years, SAP pressures in ADCO Field were managed and a fit for purpose program was set and consistently being implemented.
II. Objectives
ADCO's strategic Objective with regard to wells is to ensure that the technical integrity of all wells is maintained throughout their life cycle.
Drilling division is responsible for establishing technical integrity, and Field Operations are responsible for safeguarding technical integrity.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献