Rejuvenation of Watered-Out Fractured Carbonate Horizontal Well by Microgel/Gel Injection

Author:

Gaillard Nicolas1,Omonte German1,Bouillot Jerome1,Zaitoun Alain1,Duboin Francois André2,Bertrand Charles2

Affiliation:

1. Poweltec

2. International Petroleum Corp

Abstract

AbstractIn a world where oil production declines and where investments in fossil resources are lower and lower, operators are looking for solutions to optimize the production of existing wells. This is the case for horizontal wells in carbonate formations suffering from channeling with strong bottom aquifer. Such problem occurred for well MRS-1H located in France. Its production started in 2001 with high water-cut (80-85%) that increased rapidly with time to reach 99.7% in 2022 for a gross production of 5000 bpd. Even with a barrel at 80 USD, the extraction of oil in such conditions is not economical due to the high OPEX required for pumping and water disposal. A Water Shutoff (WSO) treatment was designed having as target to decrease water production by, at least, a factor of 2, while keeping the volume of oil production at same level.The bottom aquifer is located in the very permeable Upper Bathonian formation, just below Lower Callovian formation. Oil in place is 36° API with a viscosity of 3.3 cp. Reservoir temperature and pressure are 70 °C and 186 bar respectively. Reservoir water salinity is between 5 to 10 g/L TDS.The main problem is the presence of a channeling connection between the well and the aquifer by a fracture network localized close to the heel of the horizontal drain. WSO treatment consisted in injecting by bullheading a first slug of microgel followed by a slug of elastic gel followed by a third slug of microgel. The total volume of the chemical treatment was 300m3.During the injection, wellhead pressure increased and remained stable below 60 bar for an injection rate of 3bpm. The fact that pressure did not build up (especially during the injection of the gel slug) indicates that the treatment penetrated in low resistance flow areas (fractures). After 15 days of shut in, the well was put back on production, showing a dramatic drop of gross production rate, reaching 630 bpd while it was 5000 bpd before the treatment. The oil production reached 17 bpd corresponding to an oil cut of 2.5% (compared to 0.3% initially). The well has kept this behavior with time, making its production economical.The bullhead treatment combining microgel and gel proves to be a good WSO strategy for wells suffering from strong bottom aquifer channeling and should have many applications in fractured carbonate reservoirs.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3