Developing Oil in Monobore Well Completion Using Permanent Coil Tubing Gas Lift Application

Author:

Kramadibrata Ari Taufiq1,Sumaryanto Sumaryanto1,Panjaitan Pahala1

Affiliation:

1. VICO Indonesia

Abstract

Abstract VICO Indonesia has operated the Sanga-Sanga PSC in East Kalimantan, Indonesia, since 1968. More than 750 development wells have been drilled to date in the complex Mahakam Delta in East Kalimantan. The mature reservoirs are predominantly gas, extremely depleted and have an average recovery factor of about 70%. To optimize the development cost VICO changed the completion from multi string and multi packers to monobore in 1997 and furthermore to dual monobore in 2005. VICO has also focus to optimize oil production and recovery. The current oil recovery factor is relatively modest and needing further detail study and optimization. A multi-disciplinary team was performed to further evaluate oil potential in all VICO fields including review of historical performance, geology and development opportunities. These reservoirs were also evaluated using material balance to understand the initial volumes in place, the drive mechanism and the opportunity to maximize production and oil recovery through the existing wells. One of the challenges in maximizing oil recovery is artificial lift system in monobore completion. VICO has evaluated and selected gas lift as optimum artificial lift method. There are two possibilities to gas lift oil wells (1) using a side pocket mandrel in the conventional dual string completion and (2) inject gas lift through coil tubing in the monobore completion. The paper describes innovative gas lift system in monobore completion where gas lift mandrels were not pre-installed. This technique has been implemented, by running 1.5" coil tubing into a well through a special tubing hanger attached to the top of the Christmas tree. This technique allows gas lift to an oil reservoir in monobore well completion without requiring rig for recompletion. This application is known as "Permanent Coil Tubing Gas Lift" or PCTGL. This technique has been implemented in "MUT-X" well that was not capable to flow naturally, and then PCTGL was installed to resume oil production. The well was flowing 600 BOPD initially and now is continue flowing at 350 BOPD. In summary, PCTGL is a proven favorable and simple method for artificial lift application in monobore completion to maximize oil production and recovery. Furthermore, this technique has helped VICO in synergizing gas and oil development to maximize value of the assets.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3