1. The Performance of Water Injection Wells Equipped with ICD completion in One of the Giant Offshore Field, Abu Dhabi;Channa;ADIPEC,2016
2. Novel Integrated Approach Simultaneously Optimising AFI Locations Plus Number and (A)ICD Sizes;Dowlatabad;Society of Petroleum Engineers,2015
3. A New ICD/ICV well completion design optimizer and well management logic for full field reservoir simulation with multiple ICD/ICV wells, Abu Dhabi;Li;ADIPEC,2017
4. A Game Changer for Injection Wells Outflow Control Devices to Efficiently Control the Injection Fluid Conformance;Mohd Ismail;Society of Petroleum Engineers,2019
5. Production Optimisation of Heavy Oil Wells Using Autonomous Inflow Control Devices;Moradi;Society of Petroleum Engineers,2018