Abstract
Abstract
Openhole gravel packing has proven to be one of the best sand control completion methods in the industry with high reliability and low skin. As more and more wells are being drilled in challenging environment (long drain lengths, depleted formation, wellbore stability concerns, presence of faults, etc.) with low fracture window, the ability to fully pack the openhole sections constrains the wider use of the method. Many techniques have been used to overcome the low fracture window challenge both in alpha beta and shunted gravel packing. This paper will review the techniques used in both gravel packing approaches, highlight their working mechanisms, and provide a comparison of these methods.
Techniques such as packing with friction reducer, BOP open, use of lighter carrier fluids, running diverter valves, wash-pipe less Bottom Hole Assembly (BHA), managed pressure gravel packing etc. have been successfully used depending on the available fracture margin, well configuration and gravel packing technique. The paper will briefly touch on the challenges leading to low fracture margin and the necessity to utilize one or a combination of the techniques to fully pack wells. It will then describe the working principle of each of the techniques, provide the advantages and disadvantages of the techniques. This will be complemented with several case histories showing how these wells were successfully completed despite the low fracture pressure window.
Reference20 articles.
1. Alexander
K.,
Bruce
D.,
et al.
2019. Evolution of Open-Hole Gravel Pack Methodology in a Low Frac-Window Environment: Case Histories and Lessons Learned From the Kraken Field Development. Presented at the SPE Annual Technical Conference and Exhibition, Calgary, Alberta, Canada, September 2019. https://doi.org/10.2118/195937-MS
2. Aston
M. S.,
Alberty
M. W.,
et al.
2004. Drilling Fluids for Wellbore Strengthening. Presented at the IADC/SPE Drilling Conference, Dallas, Texas, March 2004. https://doi.org/10.2118/87130-MS
3. Barbieri
E.,
Zanchi
A.,
et al.
2011. Enhancing Storage Efficiency In Underground Gas Storage Wells Through Open-Hole Completions. Presented at the Offshore Mediterranean Conference and Exhibition, Ravenna, Italy, March 2011. OMC-2011-179
4. Baser
B.,
Shenoy
S.,
et al.
2009
An Alternative Method of Dealing With Pressure: Friction Reducer for Water Packing of Long Horizontal Open Holes in Low-Fracturing-Gradient Environments. Presented at the SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, USA, October 2009. https://doi.org/10.2118/123155-MS
5. Coronado
M. P.,
Corbett
T. G.
2001. Beta-Wave Pressure Control Enables Extended-Reach Horizontal Gravel Packs. Presented at the SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, September 30–October 3, 2001. https://doi.org/10.2118/71668-MS
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献