Affiliation:
1. BP Exploration (Alaska) Inc.
2. Arco Alaska Inc.
Abstract
Summary
Water injection into horizontal wells is a new and distinct technology, where success will often depend on the management of thermal fractures. This paper describes the background, planning, drilling, completion, and results of the first two high-angle water injection wells in the Prudhoe Bay field. The procedures described resulted in re-establishing injection in the correct zone, achievement of target rates and good injection profiles.
Publisher
Society of Petroleum Engineers (SPE)
Subject
Process Chemistry and Technology
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献