Successful Implementation of First Closed Loop, Multiservice Control System for Automated Pressure Management in a Shallow Gas Well Offshore Myanmar

Author:

Fredericks Paul Douglas1,Reitsma Don2,Runggai Tom3,Hudson James Neil3,Zaeper Ralf4,Backhaus Oliver,Hernandez Maximo5

Affiliation:

1. At Balance

2. At Balance Americas LLC

3. Petronas Carigali Sdn Bhd

4. Baker Hughes INTEQ

5. Grant Prideco

Abstract

Abstract In plans to explore the shallow gas potential of the Nagar prospect offshore the southern coast of Myanmar, PETRONAS had to contend with a number of potentially high risk issues. The shallow nature of the hazardous prospect made kick detection speed and pressure control accuracy essential to avoid losing returns. Concerns about a weak casing shoe, a narrow drilling margin, the inability to control bottom hole pressure (BHP) while circulating out gas, and the short response time needed, demanded a solution before the shallow gas-bearing sands could be drilled safely from the available moored drill ship with its conventional subsea equipment. From flow modeling it was estimated that within 3 minutes the system and procedures would have to detect and shut-in a gas influx, then commence circulating it out, all while controlling the BHP of a flowing, multiphase fluid within extremely narrow safe limits. It was concluded that the Nagar well could only be safely drilled with a pressure management system that could maintain BHP within +/− 15 psi while drilling and +/− 45 psi during connections and well control. In an industry search, PETRONAS learned that no system existed with the functionality needed, but by electing to combine new and existing technologies from three separate providers they were the first to develop one that did. This industry-first solution involved integrating elements of the technology developed for automated pressure control, pressure while drilling (PWD), and high speed, drill string telemetry. Modifications had to be made to a number of elements, including the pressure control and PWD systems, to obtain the necessary functionality. Given the safety critical nature of the drilling hazards, the modifications and system integration were first tested during simulated kicks with downhole nitrogen injection, before drilling out the casing shoe. During testing on the rig and subsequent drilling operations, the integrated system proved its ability to maintain a near constant BHP, with the accuracy and speed needed to safely and successfully drill the Nagar prospect. Introduction The Nagar-1 well is an exploration well located in block M16 in the Andaman Sea under more than 400 meters of water. A map of the area and the location of the well are shown in Figure 1. PETRONAS identified this prospect from seismic surveys as a possible source of gas production from several shallow gas bearing sands lying between 260 and 400 m below the sea floor. As a wildcat well the drilling objective was to confirm the presence of hydrocarbons in the target zones and like other wildcat areas there are no offset wells in close proximity to the proposed well location. The closest offset wells were over 100 km away in less than 200 m of water.

Publisher

SPE

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3