Affiliation:
1. Agip Oil Ecuador, an Eni subsidiary
Abstract
Abstract
This paper aims to show the behavior of a 66° deviated well completed with Inflow Control Devices (ICD) after 5 years of production, making a comparison with two analogous wells that have a standard Casing and Perforated completion (C&P). At that time, this type of installation (2011) was the first case in Latin-America. The study is complemented with the performance of two ICD installed in parallel with two horizontal wells.
The analysis describes the ICDs completion for a deviated well, the reasons why the well was completed in this manner and the production results obtained for three wells (1 ICD and 2 C&P) using elapsed time comparisons. The analysis considered the historical Water Cut (WC), the Productivity Index (PI), and Fluid Performance (Oil and Water). Furthermore the use of diagnostic plots to identify the water production mechanism taking into accounts the main facility (water treatment) constraints during the production of the wells.
The deviated ICD completion allowed a Water Cut reduction of at least 10% after 5 years of production, delaying the premature water channeling with an positive reserve impact compared with analogous C&P wells. Moreover this type of completion provides a new way to complete deviated wells, with more than a 45° angle, where the quality of the initial cementation job is doubtful.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A Tracer Technology Applied for Inflow Profiling While Monitoring Individual AICD/ICD Performance. A Case Study from Offshore Horizontal Wells in the South China Sea;Day 1 Mon, April 22, 2024;2024-04-22
2. Case Study of Autonomous Inflow Control Devices (AICD) to Control Water Production in Fractured Carbonate Reservoir in Eastern Montana;Day 2 Thu, March 14, 2024;2024-03-12
3. Making Better Wells with Autonomous Inflow Control Valves for Water Control in the Flank of the Bretaña Norte Oilfield, Peru. A Case Study.;Day 1 Wed, March 13, 2024;2024-03-12
4. Passive flow control devices—well design and physics of their different flow regimes: A review;Journal of Petroleum Science and Engineering;2022-11
5. Best-In-Class Water Control Through the Application of Autonomous Inflow Control Valves in Villano Field, Ecuador: A Case Study;Day 3 Wed, October 05, 2022;2022-09-26