Perforating on Wireline: Maximizing Productivity and Minimizing Gunshock

Author:

Baumann Carlos1,Gultom Denny1,Salsman Alan1,Smart Moises1,Primasari Indah2,Rahman Risal2,Warsito Sandy2

Affiliation:

1. Schlumberger

2. Total

Abstract

Abstract We present perforating on wireline with dynamic underbalance (DUB) to simultaneously maximize productivity and minimize gunshock. We focus on perforating on wireline with DUB because, when compared with other approaches, perforating with DUB is probably the best method to deliver lower tunnel plugging and lower formation rock damage, with lower risk of tool damage due to gunshock or guns blown uphole. Specifically, we present two important aspects of perforating on wireline using DUB: prediction of wellbore dynamics to assess perforation tunnel and formation cleanup and gunshock prediction to assess the risk of tool damage. We present the latest models used to evaluate perforating jobs for well productivity and for operational risks. It is well known that the DUB produced when perforating with the right gun system can remove formation rock damage and tunnel plugging produced by shape charges. What is not so well known is how much DUB (amplitude and duration) is necessary, and how to predict how much DUB will be generated by a gun system. To achieve formation tunnel cleanup, we need a DUB of large amplitude but short duration to remove perforating rock damage and plugging while minimizing gunshock loads. In the pre-job design, we simulate/predict the transient fluid pressure waves in the wellbore and formation rock to predict formation rock damage cleanup and also the associated gunshock loads. DUB amplitude and duration depend on job parameters that can be adjusted, such as type and size of guns, loading of standard perforating charges and DUB charges, and placement of packers, if present. Important physics included in the model are: gun filling, wellbore pressure waves, transient reservoir fluid flow, and the dynamics of all relevant solid components (cable, shock absorbers, tools, and guns). The reliability of the DUB prediction model is demonstrated by comparing downhole fast-gauge pressure data with the corresponding simulated values. When the reservoir properties are well known, the predicted DUB amplitude and duration are very close to the field data values, typically within 15% or less. The reliability of the gunshock loads is demonstrated with residual shock absorber deformation and cable tension logs. We also demonstrate how gunshock simulations have been useful to explain equipment failures due to gunshock loads. Reliable predictions of wellbore dynamics, transient reservoir flow, and gunshock loads enable operators to select perforating equipment capable of removing perforating formation damage and reduce the risk of unexpected release of tools and guns due to dynamic loads, thereby minimizing the probability of nonproductive time and fishing operations.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. The First Coiled-Tubing-Conveyed Long Propellant Sleeved Perforation Gun in Highly Deviated Wells – Well Performance;SPE/IADC Asia Pacific Drilling Technology Conference and Exhibition;2024-08-06

2. Extreme Underbalance Perforation on the Wire;Day 3 Thu, February 29, 2024;2024-02-22

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3