Stuck Pipe Prediction in Utah FORGE Geothermal Wells

Author:

Montes Abraham C.1,Ashok Pradeepkumar1,van Oort Eric1

Affiliation:

1. The University of Texas at Austin

Abstract

Abstract Four stuck pipe events occurred during the construction of six geothermal wells in the Utah FORGE field, causing several hours of non-productive time (NPT). All of them could have been avoided if effective preventive measures and tools had been used. This paper provides an analysis of these events with the publicly available Utah FORGE dataset and discusses their predictability using a new hybrid approach that can in future be used to avoid stuck pipe incidences at Utah FORGE. Our analysis is primarily based on physics-based simulations combined with well information, such as trajectory, lithology, and the position of the drillstring (specifically the contact points) with respect to the geometry during the time the events occurred. Based on this detailed analysis, we implemented anomaly detection techniques in the time window before each stuck pipe event to automatically identify root causes. Following this, we formulated guidelines that combine the developed early stuck pipe event detection capability with accepted industry operational practices, to prevent similar stuck events in the future. The Utah FORGE stuck pipe events were found to be primarily related to wellbore geometry (i.e., mechanical stuck pipe) and use of non-optimum operational drilling practices. The incidents, analyzed in time domain after dimensional transformations, show clear early signs of anomalies in the time frame before their occurrence. This means they could have been detected and potentially prevented. The guidelines include recommendations for acting pro-actively on early stuck pipe indicators identified by real-time data analysis, as well as making appropriate additional changes during well planning and execution phases, such as changing the bottom hole assembly to be less sensitive to mechanical sticking. The work shows the high value of robust predictive models for stuck pipe prevention. The work will help reduce geothermal well construction (which is expected to expand significantly in the near future) cost by enabling better stuck pipe NPT avoidance. However, the approach is not specific to geothermal well construction and can be expanded to all drilling applications as well as stuck pipe incidents that are non-geometrical in origin. This paper therefore provides a new real-time data analysis system and effective guidelines which, if implemented, will enable better mitigation of stuck pipe risks on future wells.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3