Elgin G4 Gas Release: What Happened and the Lessons to Prevent Recurrence

Author:

Henderson Dean1,Hainsworth David1

Affiliation:

1. Total E&P UK

Abstract

Abstract The Elgin installation is located in the North Sea, approximately 200km east of Aberdeen, Scotland. The facilities consist of a Process, Utilities and Accommodation platform with a bridge linked WellHead Platform (WHP). On 25th March 2012, Well G4 on the WHP suffered an uncontrolled release of hydrocarbons to atmosphere. This release resulted in the full evacuation from the Elgin installation and from the adjacent drilling rig. Immediately following the release, significant resources were put in place to ensure that the required emergency response was effectively managed and implemented. These resources managed both the initial response and evacuation, and the ongoing on-site situation until well control specialists killed G4 with heavy mud on 15th May 2012. Significant preparatory work was required to pump heavy mud into G4. This included detailed hazard assessment of the gas release, and the potential consequences should it have ignited. It also included carrying out risk assessments for each stage of the recovery to ensure the safety of personnel. Following the well kill operation, routine personnel returned to the installations to secure G4 with cement, and to prepare for the re-start of production. Production re-started from Elgin on 9th March 2013, following a comprehensive re-assessment of the risks from the wells. This re-assessment involved demonstrating that the risks from the wells to personnel are reduced to a level which is As Low As Reasonably Practicable, and was formally assessed by the UK regulatory authorities via the "Safety Case". This paper focuses on what happened, the lessons learned and the measures put in place to prevent recurrence. More specifically, this paper will describe: the incident, in terms of the uncontrolled hydrocarbon release which occurred, the associated leak path and the emergency responsethe work associated with killing G4 with heavy mudthe incident investigation carried out and the associated causesthe action taken to ensure that lessons have been learned to prevent recurrencethe re-evaluation of well integrity, and development of well integrity "criteria"returning the offshore facilities to a fit for purpose condition to allow production to be restartedthe role of the Safety Case and how it was used to demonstrate to the UK regulatory authorities, and to the workforce that production could be safely restarted.

Publisher

SPE

Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3