Hole Cleaning and Pressure Loss Prediction From a Bulk Transport Perspective

Author:

Datta Biplab Kumar1,Ratnayake Chandana1,Saasen Arild2,Omland Tor Henry2

Affiliation:

1. Tel-Tek

2. Statoil ASA

Abstract

Abstract Hole cleaning is still among the most important problems to handle in drilling operations and one of the most studied phenomena within the petroleum industry.Insufficient hole cleansing can lead to stuck-pipe, excessive pump pressures and equivalent circulating density (ECD), pack-offs, lost circulation, etc. all of which again can lead to loss ofsections or complete wells. Due to the number of parameters influencing the hole cleaning operation and the complex mechanisms involved, the phenomenon has not yet been fully understood. The issue of transportation of cuttings along with drilling fluids is essentially a two-phase flow.Several other industries are dealing with similar issues when transporting solids using air (fluid) as the transporting medium.Although the transporting mediums are different, flow regimes and basic transporting mechanisms similar to hole cleaning can be observed also in pneumatic conveying of particulate materials.While horizontal and vertical pneumatic transport are quite often used, very rarely people try to use inclined pneumatic conveying for the very reason that it involves much higher pressure drop as compared to both horizontal & vertical conveying and is associated with the problems of particles dropping out of suspension unless a very high fluid velocity is used.Through an extensive laboratory study a simple model[1,2,3] has been developed for pressure drop calculation in pneumatic conveying based on classical Darcy's equation with some modifications.The predicted pressure values match well with the test data. This article has tried to look at the possibility of a unified approach for two-phase flow. An attempt has been made to relate the knowledge developed in the field of two-phase pneumatic conveying systems to the challenges associated with the hole cleaning mechanism.The paper also describes some of the work that has been performed for studying hole cleaning and the associated pressure loss prediction. Introduction Pneumatic conveying is a two-phase material transportation process in which particulate materials are moved over horizontal and vertical distances within a piping system with the help of compressed air stream as the carrying medium. Using either positive or negative pressure of air or other gases, the material to be transported is forced through pipes and finally separated from the carrier air and deposited at the desired destination.It has wide range of applications, with examples ranging from domestic vacuum cleaners to the transport of some powder materials over several kilometers.Virtually all powders and granular materials can be transported using this method.Klinzing et.al[4] lists more than 270 different products which have been successfully conveyed pneumatically.It has been reported [5] that some plants have transport distance of more than 40 km, material flow rate of few hundreds tons per hour and solid loading ratio (the mass flow rate ratio of solid to air) of more than 500. In the oilfield industry, the hole cleaning operation can also be considered to be a two-phase flow, where the solid phase (drilled cuttings) is removed from the wellbore using a drilling fluid.The solids can be transported out of holes being several kilometers long having various cross sectional areas depending on hole, drill pipe and casing sizes.The amount of solids to be transported out of the hole can be up to 30 tons per hour.The type of material to be transported out of hole can also vary quite a bit both in terms of shape and consistency, which also affects the transport rates significantly.Although air drilling exists for some top hole land drilling operations, most drilling operations are conducted using a drilling fluid.Unlike in air drilling or powder transport, the transporting fluid is designed to fulfill several tasks in addition to cleaning the hole, including maintaining well control, hole stability and transmission of information to and from the downhole tools.Therefore, engineering a drilling fluid can vary from designing a fluid with an almost Newtonian behaviour to highly shear thinning fluids like the oil based drilling fluids.Furthermore, the fluids can have a significant variation in degree of viscoelasticity.All these rheological factors along with drilling fluid wetted cuttings surface properties will in turn affect the cuttings transporting capabilities for the fluid.As the cuttings are transported up annulus between the drill string and the wellbore wall, the total pressure loss in this enclosed circulating loop can be very high.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3