Affiliation:
1. U. of Calgary
2. ATECH Application Technology Ltd.
3. Paramount Resources Ltd.
Abstract
Summary
Steam-assisted gravity drainage (SAGD) is being operated by several operators in Athabasca and Cold Lake reservoirs in Central and Northern Alberta, Canada. In this process, steam, injected into a horizontal well, flows outward, then contacts and loses its latent heat to bitumen at the edge of a depletion chamber. As a consequence, the viscosity of bitumen falls, its mobility rises, and it flows under gravity toward a horizontal production well located several meters below and parallel to the injection well. Despite many pilots and commercial operations, it remains unclear how to optimally operate SAGD. This is especially the case in reservoirs with a top-gas zone in which pilot data are nearly nonexistent. In this study, a steam-chamber operating strategy is determined that leads to optimum oil recovery for a minimum cumulative steam-to-oil ratio (SOR) in a top-gas reservoir. These findings were established from extensive reservoir-simulation runs that were based on a detailed geostatistically generated static reservoir model. The strategy devised uses a high initial chamber injection rate and pressure prior to chamber contact with the top gas. Subsequent to breakthrough of the chamber into the gas-cap zone, the chamber injection rates are lowered to balance pressures with the top gas and avoid (or at least minimize) convective heat losses of steam to the top-gas zone. The results are also analyzed by examining the energetics of SAGD.
Publisher
Society of Petroleum Engineers (SPE)
Subject
Geology,Energy Engineering and Power Technology,Fuel Technology
Cited by
45 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献