Delivering Zonal Isolation between Reservoir Sublayers in Long, Horizontal 12 ¼-in. Hole Sections in Extended Reach Wells

Author:

Elhassan Azza1,Hamidzada Ahmedagha Eldaniz1,Takahiro Toki1,Motohiro Toma1,Orfali Mohd Waheed2,Phyoe Thein Zaw2,Salazar Jose2,Alaleeli Ahmed Rashed1

Affiliation:

1. ADNOC Offshore

2. Schlumberger

Abstract

Abstract Good cementing practices are required to achieve effective zonal isolation and provide long-term well integrity for uninterrupted safe production and subsequent abandonment. Zonal isolation can be attained by paying close attention to optimizing the drilling parameters, hole cleaning, fluid design, cement placement, and monitoring. In challenging extended reach wells in the UAE, different methods were employed to deliver progressive improvement in zonal isolation. Cementing the intermediate and production sections in the UAE field is challenging because of the highly deviated, long, open holes; use of nonaqueous fluids (NAFs); and the persistent problem of lost circulation. Compounding the problem are the multiple potential reservoirs; the pressure testing of the casing at high pressures after cement is set; and the change in downhole pressures and temperatures during production phases, which results in additional stresses. Hence, the mechanical properties for cement systems must be customized to withstand the downhole stresses. The requirement of spacer fluids with nonaqueous compatible properties adds complexity. Lessons learned from prior operations were applied sequentially to produce fit-for-purpose solutions in the UAE field. Standard cement practices were taken as a starting point, and subsequent changes were introduced to overcome specific challenges. These challenges included deeper 12 ¼-in. sections, which made it difficult to manage equivalent circulating densities (ECDs), and a stricter requirement of zonal isolation across sublayers in addition to required top of cement at surface. To satisfy these requirements, several measures were taken gradually: applying engineered trimodal blend systems to remain under ECD limits; pumping a lower-viscosity fluid ahead of the spacer; using NAF-compatible spacers for effective mud removal; employing flexible cement systems to withstand downhole stresses; and modeling the cement job with an advanced cement placement software to simulate displacement rates, bottomhole circulating temperatures, centralizer placement, mud removal and comply with a zero discharge policy that restricts the extra slurry volume to reach surface. To enhance conventional chemistry-based mud cleaning, an engineered scrubbing additive was included in the spacers with a microemulsion-based surfactant. The results of cement jobs were analyzed by playback in advanced evaluation software to verify the efficiency of the applied solutions. This continuous improvement response to changes in well design has resulted in a significant positive change in cement bond logs; a flexural attenuation measurement tool has been used to evaluate the lightweight slurry quality behind the casing, which has helped in enhancing the confidence level in well integrity in these challenging wells. The results highlight the benefit of developing engineering solutions that can be adapted to respond to radical changes in conditions or requirements.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Longest 9 5/8" Casing Cementing in ERD Well, A Worldwide-Record;Day 3 Wed, February 23, 2022;2022-02-21

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3