Field Performance of Propellant / Perforating Technologies to Enhance Placement of Proppant on High Risk Sand Control Completions

Author:

Folse Kent C.1,Dupont Richard L.1,Coats Catherine G.1,Finley Doug1,Nasse David B.2

Affiliation:

1. Halliburton Energy Services, Inc.

2. Shell Offshore, Inc.

Abstract

Abstract The combined use of propellants and perforating for production enhancement is not new to the petroleum industry, especially for natural completions in competent formations. When used together, the propellant is shaped in the form of a cylindrical sleeve that is positioned over a scalloped perforating carrier to combine the perforating and stimulation processes into one step. The perforating event is performed in either an under-balanced or balanced condition, followed immediately with the extreme over-balance or rapid-gas pulse generated from the propellant burn. This technique provides an effective method to ensure that all perforations are sufficiently broken down from the fracturing to accept either produced or injected fluids. This paper will review a new application for the combined propellant / perforating technique that has been successfully used in unconsolidated formations in the Gulf of Mexico. The propellant / perforating technique was used to enhance the placement of proppant during frac-and-pack and gravel pack treatments while perforating in a balanced condition. The propellant / perforating technique was used on several formation types; i.e., long intervals, highly deviated, and highly laminated with extreme permeability contrasts, that would traditionally be deemed as high risk for proper sand placement. In performing this technique, the propellant sleeves are positioned across the lower quality portions of the intervals with low permeability and resistivity to ensure that the perforations in these intervals would be broken down to accept fracturing fluids and proppant during the fracturing treatment consistent with the entire treated interval. Case histories from Gulf-of-Mexico operators have shown that this technique is effective in both underbalanced and overbalanced perforating situations. With the trend in the industry to reduce cycle time, the elimination of the underbalance/surge process to ensure clean perforations and all the associated rig time in obtaining control of the well following the surge are seen as significant opportunities for rig-time savings. It has also been proven that combining propellant/ perforating in a balanced scenario can offer a cost efficient and safe method when used as a near wellbore clean-up tool for pre-frac preparation or high rate water packing. Introduction Propellants have been available to the industry for many years and have been used in a variety of applications, primarily in the United States, Canada, China, and Russia. Review of the literature1–11 reveals the variety of applications in the industry where propellants have been used along with the degrees of success attained in these applications. The concept of using the propellants in combination with the initial tubing-conveyed perforating (TCP) to enhance the placement of proppant during a frac-and-pack completion, however, is a new application for the oilfield.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3