Iraq Operations’ Five 5 Years Waste Management Blue Print to Manage Waste in Remote Environment of Garraf, Iraq Operations

Author:

Arshad Afzariah Binti1,Yaacob M. Akmal1,Badzri Shairizal B.1

Affiliation:

1. PETRONAS Carigali

Abstract

Abstract Managing wastes in remote oil and gas operations for PETRONAS Carigali Iraq Holding B.V. in the field of Garraf, Iraq presents a multitude of challenges including unavailability of an approved waste disposal facilities, incompetent wastes management contractor and land acquisition issues requires PETRONAS to establish a Five Years Waste Management Blue Print. The objective of the blueprint is to provide strategic guidance for approaches in resolving the waste management issues in Garraf. Primary problem statement from the forecast of the cumulative impact of waste generation since day one of operation until the completion of Garraf Field Development Plan warrants the need of significant change in day to day waste management practices in Garraf. The method used in establishing this blue prints includes, eliminating and/or minimization of waste generation from source, optimizing each waste stream including reuse & recycle towards zero discharge and disposal through deployment of fit for purpose and green technologies which are environmental friendly. Additionally, PCIHBV also takes into consideration challenges of medium-skilled operator, support by stakeholder and authorities and environmental health impact. Since it has been launched in 2016, significant value creation identified as follows: Support from host authority to invest on technology deployment.Host authority accepted and acknowledge the blue print and support by approving significant environment budget despite low oil price based on long term value gain.Hazardous Waste Treatment and DisposalPrior to establishment of this blue print, all hazardous waste are stored in our HWS which will poses us to long-term liability due to mismanagement and integrity of the HW container. Various engagement and discussion were conducted between PCIHBV and host government to resolve this issue since 2016. PCIHBV established the contract with Ministry of Science and Technology (MoST) on hazardous waste treatment and disposal and being the first International Oil Company (IOC) in Iraq to establish as such contract.Cost Saving/OptimizationThe implementation of the blue print produced some significant value creation which includes cost saving by reusing some of the waste and optimization of the raw material and resources e.g. Land acquisition for landfill area, disposal cost etc.Capability developmentDevelopment of local nationality on environmental technology and inculcate mindset change on the environmental awareness

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Evaluation of carbon dioxide emissions dispersion from crude oil production of Garraf oil field in Iraq;2ND INTERNATIONAL CONFERENCE ON APPLIED RESEARCH AND ENGINEERING (ICARAE2022);2023

2. Drilling Waste Management Based on New Methods of Bioremediation and Solar Desalination;Earth Systems Protection and Sustainability;2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3