Successful MPC Application for Ultra-Deepwater Well in South America: Case Study

Author:

Souza Leonardo1,Sasso Alejandro de1,Ribeiro Danilo1,Guzman Jose1

Affiliation:

1. Halliburton

Abstract

Abstract Exploration deepwater wells demand proper planning to mitigate any potential risks during well construction where uncertainty can play an important role. For this reason, designing dependable barriers under such a scenario requires innovative techniques, such as Managed Pressure Cementing (MPC). Using Managed Pressure Drilling (MPD), the operator can control the wellbore pressure while drilling each section. This unconventional solution for a short operational window has been successfully applied in some fields around the world, with additional advantages when cementing jobs are designed and executed. The tight operational window expected for a 9-5/8-in. liner and the presence of gas were the main drivers to analyze the most likely scenarios for the cement job. The analysis describes that by managing the hydrostatic pressure of the fluids by applying pressure in the backside makes it possible to maintain control of the wellbore—without influxes or losses—before, during, and after the cement job. Nevertheless, to achieve the most reliable hydraulic modeling, critical parameters were identified for use as part of the input for a state-of-art cement simulator. The scope of the cementing job for this case study was designed using a state-of-the-art simulation software to determine expected hydraulics outcomes. The main target was to maintain the bottomhole Equivalent Circulating Density (ECD) between 12.2 and 12.4 ppg during the entire cementing job operation. This 0.2-ppg margin was achieved by applying designed Surface Back Pressure (SBP) by using an MPC operational technique and finishing in a statically overbalanced condition. Dynamic pore-pressure and leak-off tests performed before the cement job confirmed the operating window. The information obtained was analyzed using appropriate software. This previous data was important to define appropriate fluids volumes and design to calculate the minimum SBP necessary for the safe execution of the job, always aiming to reduce chances of kicks and mitigate losses. The cementing operation was performed according to the planned procedure, with no deviations, and the cementing job was performed in accord with the pumping schedule and SBP. Displacement was completed with zero mud losses, and lift pressure was observed as expected. MPC is a recommended method for zonal isolation in such cases as a small operational window, even more so when challenging deepwater scenarios are encountered. A case study of this cementing job is presented in this paper to discuss the planning process, details of the execution, and lessons learned.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3