U-Tube Wells - Connecting Horizontal Wells End to End Case Study: Installation and Well Construction of the World's First U-Tube Well

Author:

Lee Dean1,Brandao Fernando2

Affiliation:

1. Landmark Graphics Corporation

2. Halliburton Sperry-Sun, A Division of Halliburton Energy Services

Abstract

Abstract Although wellbores have been intersected before - both through planned intersections for the purpose of well control and through unplanned wellbore collisions - they have not been intersected for the purpose of actually joining their wellpaths to effectively create one smooth continuous conduit from one surface location to another. There is just one exception: the very large conduit between England and France! The purpose of this paper is to review the planning and execution of what is believed to be the world's first planned successful joining of two such horizontal wells, with a slotted liner to casing connection in between them. Introduction This paper gives a review of the scope of this project and of its desired outcome. The review will include a description of the plans for the wells including their trajectories and depths. Also included is a discussion of pre-planning activities with emphasis on the technology that was expected to make the planned intersection a success. This paper will discuss testing the specialized equipment needed to enable the intersection, mock ranging tests necessary to know the positions of the wells relative to each other, and the accuracy achieved through modified use of magnetic ranging techniques. Finally, rigsite operations will be reviewed, problems encountered will be discussed, and the lessons learned pertinent to similar efforts in the future will be disclosed. Project Goals and Objectives As with any trial or development of new technology, clear goals, objectives and expectations must be identified prior to design and implementation. It was clear from the onset that this was to be a producing well, and, as such, sand control was a concern. The intersection of the two wellbores was strictly for science and had no value to the actual production of the originally planned wellbore. The value obtained was the knowledge of what could be accomplished, so that future implementation of the technology could be considered for strategic planning purposes. Following this line of thought, the goals of this project were laid out as follows:Apply current directional drilling technology to see if two horizontal wellbores could be intersected end to end. Success was defined as intersecting the two wellbores with the drill bit and being able to enter the wellbore of the second well with the drilling assembly.Run standard steel casing through the intersection to prove that the two wellbores could be linked with solid tubulars. Success was defined as being able to run regular 7-in. casing through an 8 3/4-in. intersection point without getting the casing stuck in the hole.Join the two casing strings with a connection technique that eliminated sand production. It was agreed that the connection technique used on this first well would be as simple as possible. If this initial trial was successful, future work could be done on a more advanced connection technique. Reservoir Description / Surface Location The location selected for the trial of this technology was on land in an unconsolidated sandstone reservoir. The reservoir was only 195 m true vertical depth (TVD). The original field development plan called for several horizontal wells to be drilled under a river running through the field. It was decided that one of these horizontal wells would be an excellent location to test out this technology, as only one additional well would need to be drilled and connected to the currently planned well. Since one well was already planned to be drilled from one side of the river, a second surface location was selected on the opposite side of the river. This arrangement placed the two surface locations approximately 430 m from each other.

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3