Abstract

Abstract One of the main constraints facing many offshore platforms is the shortage of accommodation. The balance between continuing field development and maintaining existing production and platform integrity inevitably requires a compromise in the crew allocation for well engineering activities. This paper will discuss the challenge faced on Shell's Gannet Alpha platform in conducting a coiled tubing managed pressure drilling (CTMPD) operation with a 20% reduction in crew numbers over the previous CTMPD operation. The key enabler of this reduction was the use of a supplier's established onshore control centre located in Norway for remote support. A two-way real time data connection from the platform was established that allowed two key roles to be removed from the platform - drilling data acquisition and quality control, and control of a dynamic annular pressure control system. This implementation of remote support was unique as the main drilling supplier not only used this facility to reduce his rig-site presence but also facilitated other third party suppliers to remotely operate their equipment by providing space and IT infrastructure within the facility. As well as the principle benefit of reducing personnel on board required to run the CTMPD, additional benefits were realised through the dissemination of real-time data throughout the operator and supplier organisations. By utilising the WITSML data protocol, the operators reservoir model and well-planning programs were populated in real-time enabling subject experts to participate in the decision making process. Additionally, onshore technical support and engineering personnel were able to utilise the two way connection to access the offshore systems in real-time in order to troubleshoot problems, perform software upgrades and carry out diagnostics on surface hardware and downhole tools as required. This paper will describe the upfront preparation both in terms of the IT infrastructure and the personnel multi-skilling. It will then describe the ways in which the data was transmitted and used during the operation, and the contingency procedures that were developed in the event of loss of communication. Finally, the future of real time operations will be discussed and how the learnings from this operation can be used in the ongoing development of this technology. Introduction Background The Gannet 'A' platform is located in the central North Sea, approximately 120 miles East of Aberdeen. As well as the Gannet 'A' field, there are a further 6 subsea fields tied back to the platform. A requirement for infill drilling was identified in order to continue the development of the field. Drilling Methodology The original Gannet A wells were drilled with the assistance of a tender vessel which primarily provided pumping, fluids handling, solids control and accommodation services. An infill drilling feasability study concluded that re-instatement of the existing platform drilling equipment was not viable and that coiled tubing drilling was the most economic option for accessing the stranded reserves.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3