Well Management Under Uncertain Gas or Water Oil Ratios

Author:

Bieker Hans Petter1,Slupphaug Olav2,Johansen Tor Arne1

Affiliation:

1. Norwegian University of Science and Technology, NTNU

2. ABB Process Automation

Abstract

Abstract In the daily operation of an oil production system, it is often required to choke back some of the oil production wells to ensure that the processing capacity is not over-utilized. When the capacity of some processing resource is over-utilized, wells having large ratios between the consumption of the resource and the oil production rate are choked back. When there is free processing capacity, the chokes of the wells having small ratios are opened. Often, the gas or water oil ratios (derived from the water cuts) are used as such ratios. These ratios are uncertain. This paper proposes to use information about the uncertainties of the gas or water oil ratios to find the order of opening and closing the wells to maximize the expected total oil production rate from the wells. In a computational study based on field data, it is found that the order may be different from the one found using the expected value of the gas or water oil ratios and that the expected total oil production rate was increased by 10.1 % for this particular case. Introduction In the daily operation of an oil production system, operators may use various means of optimization to maximize the total oil production rate. For example, Lo and Holden [1] proposed a linear program to maximize the total oil production rate of an oil production system having a processing facility constrained by maximum total gas, water, and liquid production rates. The method assumed that the oil potential for each well was independent of the oil potentials of the other wells (independent wells). This is typically true if the wells do not share long flow lines. For offshore oil production systems, so-called platform wells often satisfies this assumption because the production manifold (a blending point) is placed on the processing platform itself close to the wellheads, and not on the seabed. For such platform wells, the pressure drop in the shared piping between the production manifold and the production separator may be regarded as constant because of the short distance and typically large diameters of the piping used. Furthermore, the method assumed that the wells do not experience gas or water coning. Gas lifted wells are in general not handled by the method. The proposed linear program [1] is shown next using a modified notation. The goal is to maximize the total oil production rate Furthermore, the oil production rate from each well must be nonnegative, where is the gas oil ratio and is the water oil ratio. For simplicity, will be used to denote the liquid oil ratio. Liquid is defined as oil and water.

Publisher

SPE

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3