Maximizing Slim Hole Well Deliverability: First Installation of 3.5" Alternate Path Open Hole Screen in Indonesia and Implementation of Erosional Velocity Analysis

Author:

Herputra S.1,Sare J. K.1,Binilang R.1,Pande B.1,Sentunata M.1,Rossi M.1,Merati P. A.2,Hosen L. H.2,Kurniawan N.2

Affiliation:

1. ENI Indonesia

2. SLB Indonesia

Abstract

Abstract This paper presents the case history of a successful application of slim open hole completion as a cost-effective solution for sand control in a subsea gas well and the optimization of production by implementing erosion velocity analysis method beyond conventional erosion limitation set by API 14RP standard. Soon after production start-up, solid production and subsequent reduction in production rate were observed in subsea gas wells at "B" field through a shape memory polymer screen completion. The company thus decided to perform a workover, sidetrack the well from 9-5/8" casing and recomplete the well in 6" × 8" Open Hole using open hole gravel pack. Due to the presence of shale, the well was drilled with oil-based drill-in fluid (DIF) to ensure open hole integrity. The DIF was displaced to low-solid oil-based mud prior to running screens and later displaced to water-based once the screen was on depth prior to pumping gravel pack fluid. In order to achieve efficient fluid displacement, thorough simulation and analysis were run. For sand control strategy, open hole alternate path system was selected in combination with Visco-elastic Surfactant (VES) gravel carrier technology to allow bypassing potential sand bridges in the annulus. Extensive fluid compatibility tests were also performed in the field to avoid incompatibility during each phase of the operation. Downhole gauges were installed in drill pipe and wash pipes to allow post-job analysis and confirm packing efficiency post-gravel pack. They also enabled identification of downhole events during job execution. The result of the analysis was then used as lesson learned for subsequent well operation. After gravel pack execution in the first well, post-job downhole gauge analysis showed premature fracture occurred during gravel packing which caused some proppant to go into the fracture. Further analysis showed that the lower section of the screens could have been plugged prior to gravel-packing, which contributed to high friction during the gravel pack which led to premature fracture. Several changes were proposed for the second well. One of them was to perform open hole displacement prior to setting packer to minimize the amount of fluid going through the screens during displacement. Gel loading and proppant concentration were also optimized to promote bridging within the open hole, activating the shunt tubes. The second well was gravel packed successfully with a positive screen-out indication. Downhole gauge data analysis also showed very little indication of screen plugging compared to the first well and good packing indication across the screen annular. Due to slim hole, there was a concern regarding erosion limitation of the completion accessories if the well is to be produced as per target rate. As a solution, an in-house erosion velocity simulation analysis was proposed. This more advanced analysis was based on fluid dynamics simulation and capable of predicting erosion more accurately than conventional method based on API RP14. It predicts erosion impact based on a set of parameters known as erosion constants belonging specifically to certain material. It also takes into account profile geometry of the equipment and predicts impact angle of incoming particles resulting in more accurate results. As a result, this fluid-dynamics-based analysis shows less conservative erosional limit than the API RP14 standard and thus allows the completion components to withstand higher production rate than initially expected. The successful application of slim hole gravel pack in combination with implementation of erosion velocity analysis based on fluid dynamics demonstrates that despite limited flow area through the completion components, gas production rate can still be maximized without risking erosion to the downhole equipment. More importantly, both wells have been producing sand-free and are currently delivering at targeted production rate.

Publisher

SPE

Reference8 articles.

1. Recommended Practice for Desire and Installation of Offshore Production Platform Piping System;API-RP 14E,1981

2. Managing sand production and erosion;DNVGL-RP-O501,2015

3. First Successful Mechanical Cutter Cut Tubing Under Compression Including Three Different Types of Control Lines;Melly

4. A Success Story of Using Deepwater Semisubmersible Drilling Rig for Workover Operation in 400 meters Water Depth without Utilization of Anchoring System;Ronald,2023

5. Alternate Path Completions: A Critical Review and Lessons Learned from Case Histories with Recommended Practices for Deepwater Applications;Hurst

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3