Supersize Hole Creates Drilling Opportunity

Author:

Mason Colin1,Wenande Bill2,Chen David C-K.3

Affiliation:

1. BP Exploration

2. BP Azerbaijan

3. Halliburton Co.

Abstract

Abstract Traditional well designs for high angle and extended-reach wells often mandate long 12¼" hole sections through the overburden. Effective hole cleaning and wellbore instability management are key technical challenges commonly associated with delivery of this section. However, despite the use of rotary steerable systems, which help promote good hole cleaning and minimise open hole exposure times, problematical trips out of hole are commonplace. The symptoms of tight hole are often associated with significant cuttings bed accumulations, use of packed assemblies or creep arising from swelling formations. In an attempt to improve overall drilling performance, a supersize hole strategy has been implemented to intentionally drill an enlarged hole through the overburden. At face value, this tactic seems to have as many disadvantages as advantages. However, practical experience of simultaneously drilling and underreaming 12¼"×13½" hole sections over a number of wells has resulted in overall efficiency improvements. The primary benefits associated with drilling an enlarged hole are ease of tripping-out drilling assemblies and more straightforward casing runs. Other advantages relate to lower downhole pressures or equivalent circulation density (ECD), decreased swab and surge pressures, and less string contact area. Disadvantages relate to increased hole cleaning requirements, additional tool failures as a result of higher vibration and a decreased rate of penetration (ROP). The paper discuss es various aspects of drilling and underreaming and contrasts results between enlarged and conventional hole sizes. Results from drilling both 12¼" and 12¼"×13½" hole sections in the Azeri-Chirag-Guneshli (ACG) fields in the Caspian Sea are reported. ROP (Rate of Penetration) and a new metric TTSW (Time To Secure Wellbore) are used to provide meaningful comparisons. Introduction The Caspian Sea includes an area of world class hydrocarbon accumulations. Reserve estimates for the ACG development are in excess of 5.4 billion barrels. Anticipated production rates are expected to exceed one million barrels per day by 2010. Hundreds of wells will be drilled from various platforms and semi-submersibles to exploit reserves across the structure. Having a cost effective well design strategy for the various well types will enhance both drilling performance and ultimate recovery of reserves. A significant number of these wells will be highly deviated or extended-reach in nature. Experience to date has shown that drilling and casing running through the overburden at high angle is particularly challenging. This is primarily due to interdependent problems arising from wellbore instability, hole cleaning and casing running. The paper will first provide an overview of operations on the first extended-reach wells drilled from the Chirag Platform. The discussion will then be extended to show how improvements to the basic well and casing design have helped to overcome problems in these early wells. The paper will then focus on more recent developments where field trials have explored the impact of purposefully drilling an enlarged hole section through the overburden. A comparison of the advantages and disadvantages of drilling an underreamed hole section will be given. The main differences hinge on managing hole cleaning, downhole vibration and performance. Each of these topics is examined in more detail where results from various field operations are used to illustrate various points. Finally, the paper addresses the issue of selecting the right hole size for underreaming and discusses options for future well designs. Chirag Field History The Chirag platform is located 120 km East of Baku in a water depth of 120m. The 24 slot jacket was installed in 1993 and first oil achieved in 1997. The initial drilling programme comprised 15 wells which were in close proximity to the platform. Early drilling operations were considered relatively trouble free; however in higher step-out wells just beyond 4 km, higher levels of non-productive time (NPT) were experienced.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Stick-slip investigation of dual drilling and reaming bottom hole assembly;Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science;2021-07-26

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3