A Study of the Permanence of Production Increases Due to Hydraulic Fracture Treatments

Author:

Fast C.R.1

Affiliation:

1. Stanolind Oil and Gas Co.

Abstract

In order to evaluate the ability of a Hydrafrac treatment to effect asustained increase in well production, data were accumulated on the first 65wells in 26 fields treated by Stanolind. Since these data were obtained fromsuch a large number of fields, it is felt that individual well or reservoircharacteristics do not affect the overall picture, as might be the case if thestudy were made in one field or one group of wells in a field. These data aretabulated in Table I and plotted on Figs. 1 and 2. An analysis of Fig. 1 shows that at the end of six months, 75 per cent, or45, of 60 wells on which data were available showed a sustained productionincrease. At the end of two years, data were available on 25 wells. Of these,15 wells, or 60 per cent, showed a sustained production increase. At the end ofthree years, 55 per cent, or 10, of 18 wells had a production rate greater atthat time than before Hydrafrac treatment. The lack of information onadditional wells at the end of the third year is primarily a result of thesmall number of treatments conducted in the early stages of field applicationof this process. Production data on wells treated more than three years ago arelimited to so few wells that they were not considered. Fig. 2 contains two plots of the production data from the wells surveyed, expressed as per cent of pretreatment production plotted against time in yearsafter treatment. Only the wells showing a sustained increase in production wereconsidered in the upper plot, while all wells on which data were available wereconsidered in the lower plot. The upper curve shows that two years aftertreatment, the production from these wells was 200 per cent greater than beforetreatment. Even after three years, these wells were producing at a rate thatwas 134 per cent of the pre-Hydrafrac production rate. When considering all ofthe wells treated from which data were available, it may be seen from the lowercurve that after two years over 150 per cent of pre-Hydrafrac production wasbeing maintained. The production from these wells did not decline to thepretreatment level until approximately two and three-fourths years aftertreatment. The increased production shown on Fig. 2 is all net increased production, since the cost of Hydrafrac treatment of all wells was paid out during thefirst six months of production not shown on this graph. T.N. 108

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3