First Successful ESP-DST Well Test in Heavy Oil Unconsolidated Sandstone in Caspian Sea

Author:

Dosmukhambetov Issatay1,Taubayev Bakhytzhan1,Yesbolov Ualikhan1,Sadykov Aikhan1,Shmalin Muratbek1,Akbayev Beibit2,Kaipov Yermek2,Ramatullayev Samat2,Kuvatov Daniyar2,Amanbayev Olzhas2,Khaziev Bulat2

Affiliation:

1. Zhambyl Petroleum, LLP

2. Schlumberger

Abstract

Abstract The Caspian offshore is a prolific area for hydrocarbon accumulation. Since it is an offshore, it is a challenging area in terms of strict environmental regulations and safety. At the early stage of the project it was clear, that formation properties of the exploration well require artificial lift assistance to produce during well testing. Therefore, designing proper DST string with ESP was crucial to the success of well testing. This paper describes unique combination of technologies and techniques that enabled a DST with ESP in combination with the Y tool, that provides capabilities to run thePLT below the pump. Also, one of the main challenges of well testing operation was to handle heavy oil fluid at surface. Being in environmentally sensitive area, designing a surface well testing equipment in a limited footprint, that enables efficient separation and disposal of heavy oil was very critical. Another challenge was unconsolidated formation with the high risk of sand production under drawdown, therefore downhole testing string and ESP pump supposed to withstand large quantity of solids during the production. The key technology that enabled testing was a new generation of abrasion resistant ESP pumps, that are designed to handle extensive solids production. The heavy oil also posed a number of risks. The surface equipment was specifically designed to heat oil in the tanks and if required to mix with diesel before flaring operations. Local regulation does not permit production during the night time and allows limited number of days for well testing. Therefore, well testing design must enable to acquire all necessary information within short period of test duration. The real-time data transmission and interpretation was a key to achieve main goal of the testing in exploration well - to accurately characterize the reservoir. This was the first successful ESP-DST in Caspian Sea. Despite of many challenges, the technologies that were selected for well testing operation was proven to be reliable. This allowed Operator to untap previously not accessible hydrocarbon reserves.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Revisiting Troubleshooted Drill Stem Test: Methodological Framework Incorporating Artificial Intelligence;SPE Nigeria Annual International Conference and Exhibition;2024-08-05

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3