The Caspian offshore is a prolific area for hydrocarbon accumulation. Since it is an offshore, it is a challenging area in terms of strict environmental regulations and safety. At the early stage of the project it was clear, that formation properties of the exploration well require artificial lift assistance to produce during well testing. Therefore, designing proper DST string with ESP was crucial to the success of well testing.
This paper describes unique combination of technologies and techniques that enabled a DST with ESP in combination with the Y tool, that provides capabilities to run thePLT below the pump. Also, one of the main challenges of well testing operation was to handle heavy oil fluid at surface. Being in environmentally sensitive area, designing a surface well testing equipment in a limited footprint, that enables efficient separation and disposal of heavy oil was very critical. Another challenge was unconsolidated formation with the high risk of sand production under drawdown, therefore downhole testing string and ESP pump supposed to withstand large quantity of solids during the production.
The key technology that enabled testing was a new generation of abrasion resistant ESP pumps, that are designed to handle extensive solids production. The heavy oil also posed a number of risks. The surface equipment was specifically designed to heat oil in the tanks and if required to mix with diesel before flaring operations.
Local regulation does not permit production during the night time and allows limited number of days for well testing. Therefore, well testing design must enable to acquire all necessary information within short period of test duration. The real-time data transmission and interpretation was a key to achieve main goal of the testing in exploration well - to accurately characterize the reservoir.
This was the first successful ESP-DST in Caspian Sea. Despite of many challenges, the technologies that were selected for well testing operation was proven to be reliable. This allowed Operator to untap previously not accessible hydrocarbon reserves.
Reference6 articles.
1. Brenman
B.
, Lucas-ClementsC.,
2001. Methodologies Solutions, and lessons learned from heavy oil well testing with an ESP, Offshore UK in the Bentley field, block 9/3b. SPE paper 148833 presented at the Canadian Unconventional Resources Conference held in Calgary, Canada, 15-17 November
2. Sikander
S.
, BadrA.,
2010. Remote Real time well testing – experience in the Grove gas field in the North Sea. SPE 127909 presented at the SPE Intelligent Energy Conference and Exhibition held in Utrecht, the Netherlands, 23-25 March 2010.
3. Dudley
Q.W.
, 1987. Reperforation of North Sea electric submersible pump wells with an ESP/Y-too/TCP system. SPE paper 16534 first presented at the SPE Offshore Europe Conference held in Aberdeen,8011September 1987.
4. Theuveny
B.
, Segeral, G. and PinguetB.
2001. Multiphase flow meters in well testing applications. SPE 71475, presented at the 2001 SPE annual technical conference and exhibition held in New Orleans, Louisiana, 30 September-3 October 2001.
5. Pinguet
B.
, PechardP.,
2008. Methodology of calibration for nucleonic multiphase meter technology for SAGD extra heavy oil. SPE 117562 presented at the 2008 SPE International thermal operations and heavy oil symposium, Alberta, Canada, 20-23 October 2008.