Affiliation:
1. Petroleum Development Oman
Abstract
Abstract
Petroleum Development Oman operates large amount of gas wells in Sultanate of Oman. Due to the liquid loading occurring in these ageing assets, PDO has already installed 110+ Velocity String completions in the various gas fields across the concession area. In the 2015–2019 period, 39 wells in the Saih Rawl field were retrofitted with Velocity Strings. This paper presents the integrated and standardized approach to Velocity String candidate selection and compares the production performance post-installation against the forecast.
Reference6 articles.
1. Gas Well Deliquification;Lea,2008
2. Oman, 2 7/8" Velocity Strings in Deep and Tight Gas Wells;Goedemoed,2010
3. Non-Darcy Flow Near Hydraulically Fractured Wells;Hagoort;Society of Petroleum Engineers,2004
4. Boost Capacity of Velocity String Completions in Sultanate of Oman by Including Sliding Side Door;Hinai,2017
5. LEAN Methodology in a Long Term Velocity String Campaign, a Step Forward in Snubbing Operations;Romero;Society of Petroleum Engineers,2015