Lessons Learned from a Prematurely Ended High-Pressure Air Injection Test in a Light Oil Naturally Fractured Reservoir

Author:

Gonzalez Guevara Jose Antonio1,Chavez Morales Silvia Maria2,Hernandez Hernandez Thalia Iveth2,Gachuz-Muro Heron2,Lopez Jimenez Bruno A.3

Affiliation:

1. Pemex Exploracion y Produccion (Corresponding author)

2. Pemex Exploracion y Produccion

3. Universidad Nacional Autonoma de Mexico

Abstract

Summary Sixty billion barrels of oil still reside in the matrix of mature onshore and offshore Mexican reservoirs located in the southeast basins after primary and secondary recovery. Capillary and viscous forces are responsible for this amount of oil retained within the pore structure of the matrix (immobile oil). Gravitational forces are not enough to counterattack these forces due to the high fracturing intensity. On the other hand, laboratory testing demonstrates that oil residing in the matrix could be mobilized by the exothermic reaction that takes place with air injection. Air injection in homogeneous heavy and light oil sandstones and nonfractured limestones, at small or large scales during short and long periods of time, is feasible for producing resources technically and economically nonrecoverable by other means. However, to the best of our knowledge, the published literature does not report any application of an air injection project in naturally fractured reservoirs. During 2015, an air injection pilot test was performed in a light oil naturally fractured reservoir in Mexico, referred to as “A” field. The implementation of the pilot test was preceded by its corresponding laboratory study, which consisted of five accelerating rate calorimeter (ARC) tests and two combustion tube (CT) experiments. The analysis of the aforementioned experimental work led us to corroborate that air and oil react at reservoir conditions. Based on the above finding, the pilot test was conducted by injecting air at a rate of 10 MMscf/D with a wellhead pressure of 4,500 psia for 1.5 years, which was followed by a 1.5-year production period giving a total of 3 years for the pilot test. The results indicate that combustion was successfully applied in the reservoir. However, no oil was produced. This paper discusses the results of a prematurely ended air injection pilot test in “A” field and the main lessons learned from it, which could help in the design and its subsequent implementation in other naturally fractured reservoirs.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Geology,Energy Engineering and Power Technology,Fuel Technology

Reference15 articles.

1. An Appraisal of High Pressure Air Injection (HPAI) or In-Situ Combustion Results from Deep, High-Temperature, High-Gravity Oil Reservoirs Engineering Aspects of Light-Oil Recovery by Air Injection;Erickson,1994

2. Thermally Induced Microfractures and Improved Recovery from Shale;Griffin,2020

3. Air Injection Technique (LTO Process) for IOR from Light Oil Reservoirs: Oxidation;Greaves,1998

4. Inyección de Aire Para La Incorporación de Reservas En Yacimientos Naturalmente Fracturados (in Spanish);Flores,2007

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3