Well Production Optimization through Annulus Gas Management using Gas Handling System in Auca Field, Ecuador.

Author:

Briones Luna César Alejandro1,Villa Alzate Carlos1,Pastrana Vargas Wilmar Andrés2,Azancot Annalyn1,González Martínez Darío De Jesús1,Segovia Galárraga Rubén Darío3,Campana Álvarez Danny Rafael3,Salcedo Vallejo Jaime Patricio3,Cadena Espín Raúl Fernando3,Canaveral Caizaluisa Edwin Gonzalo3,Gambaretto Agustín2,Paredes Martínez Walter Vinicio4,Molina Edison4,Vera César Andrés4,Arévalo Diego4

Affiliation:

1. Schlumberger del Ecuador S.A.

2. Schlumberger Limited

3. Shaya Ecuador S.A.

4. EP PETROECUADOR

Abstract

Abstract Improving production is a main goal in the industry, mainly in countries where now it is possible to apply accessible technology. Digital Oil Field projects have been successfully implemented worldwide, showing their value in terms of losses reduction and oil production optimization. Annular Gas handling system (AGHS) is part of those projects, aiming to improve well production systems. Gas accumulation in the annulus is a well-known operational condition which may lead, depending on the volume and associated gas, to ESP production system issues (gas lock). With this in mind, a technical team was formed to create an autonomous annular gas handling system with the main objective to optimize production by avoiding gas related issues, but also to reduce human intervention in the process. This is translated into less kilometers driven and therefore less people exposure. The main task of the gas handling system consists in regulate the gas outlet through an automatic valve according to a remote order. This order can be given as a percentage of opening denominated "manual control", or as a value of casing head pressure (CHP), denominated "automatic mode" where the valve keeps adjusting automatically in order to maintain the set point pressure (SP). In this way, the manual operation of the annulus valve from an operator on-field is no more needed. This case solution presents the pilot test results and a feasibility analysis for the expansion of the AGHS Skids. The pilot included two wells in the Auca brownfield: ACAK-182 and ACAK-124, in which an incremental production of 30% and 12% respectively was achieved after pilot implementation. Additionally, manual annular valve interventions were reduced 98% after the automated gas-handling system was tested. This project demonstrated that intelligent, customized and specific solutions enabled incremental production at a very low cost, reducing people exposure by avoiding trips from pad to pad for annular valve manipulation. Additionally, AGHS Skid improved the efficiency of the ESP in 11% and reduced energy consumption in 11% KVA resulting in higher production with lower power consumption. Also, people were able to spend time working on production optimization rather than operational tasks.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3