Abstract

Summary Polymer injection might lead to incremental oil recovery and increase the value of an asset. Several steps must be taken to mature a polymer-injection project. The field needs to be screened for applicability of polymer injection, laboratory experiments have to be performed, and a pilot project might be required before field implementation. The decision to perform a pilot project can be dependent on a value-of-information (VOI) calculation. The VOI can be derived by performing a work flow that captures the effects of the range of geological scenarios, as well as dynamic and polymer parameters, on incremental net present value (NPV). The result of the work flow is a cumulative distribution function (CDF) of NPV linked to prior distributions of model parameters and potential observables from the polymer-injection pilot. The effect of various parameters on the CDF of the fieldwide NPV can be analyzed and in turn used to decide which measurements from the pilot have a strong sensitivity on the NPV CDF, and are thus informative. In the case shown here, the water-cut reduction in the pilot area has a strong effect on the NPV CDF of the polymer-injection field implementation. To extract maximum information, the response of the pilot for water-cut reduction needs to be optimized under uncertainty. To calculate the VOI, the expected-monetary-value (EMV) difference of a decision tree with and without the pilot can be used if the decision maker (DM) is risk neutral. However, if the DM requires hurdle values through a probability of economic success (PES), value functions (VFs) and decision weights according to the prospect theory should be used. Applying risk hurdles requires a consistent use of VFs and decision weights for calculating VOI and the probability of maturation (POM) of projects. The methodology was applied to assess the VOI for a horizontal-well pilot in the ninth Tortonian Horizon (9TH) Reservoir in Austria for a risk-averse DM. The operating parameters (polymer concentration and water injection) were chosen such that the water-cut reduction, which was the most influential parameter of the polymer pilot on the field NPV CDF, was maximized.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Geology,Energy Engineering and Power Technology,Fuel Technology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3