Extending Life for Offshore Wells by Fixing the Integrity High Annulus-B Pressure and Creating Zonal Isolation Using a Novel Remediation Technique

Author:

Ansari Arsalan A.1,Ringrose David1,Libdi Ziad1,Larsen Arne G.2

Affiliation:

1. Zakum Development Company

2. HydraWell Intervention

Abstract

Abstract Increasing global demand for additional energy requirement - forecasted to increase up to 74% by 2030 - has catalyzed the petroleum industry to perform extensive research into rectifying structural well integrity issues in order to extend the life and return older wells to production and injection. These issues are mainly caused by failure of corroded surface casing. Due to the inability to provide integral barriers in the 95/8″ casing x 12¼″ hole annulus, these wells are planned to be abandoned or completed as single zone wells. Perforate, Wash and Cement remediation strategy is one of the innovative approaches that can be utilized in wells to provide strong integral cement barriers behind the 95/8″ casing to prevent reservoir fluids migrating to surface. This approach is gaining increased popularity due to a number of economic and environmental advantages such as reduction in costs for abandonment of current wells and drilling of new wells, mitigate environmental concerns, restoring the well production/injection with minimum workover costs and eliminating the risk with section milling of not being able to re-enter the casing. The research utilizes a Novel Remediation technique for providing integral cement barriers in the 95/8″ x 133/8″ casing annulus above the reservoir for wells experiencing migration of hydrocarbons from reservoir through the 95/8″ x 133/8″ casing annulus. The planned methodology starts with completion recovery followed by running cement, noise, temperature and corrosion logs in order to evaluate the cement quality behind 95/8″ casing above the reservoir and the corrosion level for 133/8″ casing. Findings from the noise/temperature logs and oil sample evaluation indicate that oil is migrating from the reservoir, through 95/8″ x 133/8″ casing annulus, dripping at surface through the 30″ conductor pipe. The cement bond logs indicate poor cement behind 95/8″ casing above the reservoir. However, the results from Metal thickness detection logs indicate low corrosion (~10-15%) in the 133/8″ casing, eliminating the necessity for any external casing patch to restore 133/8″ structural integrity. Therefore, Perforate, Wash and Cement remediation strategy was successfully applied and the integrity of the dual water injector well was restored by placing 100-feet cement barrier behind perforations in the 95/8″ casing above the reservoir. In addition a 7″ short tie-back was installed over the perforated cemented interval. Hence, the 95/8″ casing was re-established as a well barrier element in the well, allowing the injection rate for the well to be restored. This strategy may be developed as an economic saving technology as it saves us approximately 5-8 days per well with associated significant CAPEX and OPEX savings by avoiding additional costs on section milling and solving problems encountered with section milling. It is feasible to be applied in offshore wells having integrity issues as it extends the life of the well without taking on additional environmental risk.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3