Success Story of Repairing Casing Leak Near Surface Using a Bandage Cementing Technique in Central Sumatra Basin

Author:

Kurniawan Imron Fajar1,Tarigan Jan Hendri1,Hamdani Nanang Lutfi1,Dova Rudi1,Nataliawati Nurul Ayu1

Affiliation:

1. Pertamina Hulu Rokan

Abstract

Abstract During the water injector workover campaign in 2018, some casing leakage near the surface was identified (depth range 10 to 300 ftRT). Several attempts were made to seal the leakage, but none of them succeeded. In response to investigation, a specific cementing technique was developed, called "bandage cementing", and it was successful in repairing casing leaks near the surface with over 75% success rate. The focus of this technique is to build a column of cement in annulus between production casing and surface casing to create a "bandage" covering all leaking points in production casing. To build it, a cement evaluation log was run to investigate the presence of cement in annulus surface-production casing. A perforation gun was then run into the well to make some holes in production casing below leaking points. Injectivity and communication test was then performed to check the connection between perforation hole and leaking points and casing valve in surface. Once communication confirmed, cement retainer was then deployed to perform cementing jobs inside production casing and in annulus surface-production casing. The goal is to fill the void in annulus between surface and production casing with cement to build a cement column covering the casing leak. This repair casing technique was applied to 4 (four) water injector wells with casing leak problems. The repair job succeeds to seal the casing leaks and all wells were put back on injection. They passed the pressure test and confirmed the leak was completely sealed. The key success for this repair casing method lies in how well we can place cement columns to surround the leak points from both below and above the leak. Several observations include whether the injectivity connection could be established between leaking points, perforation hole and casing valve and how much barrel of cement could be placed behind the casing are the supporting factors to achieve it. The goal of this paper is to provide an alternative to casing repair for wells with casing leak problems near the surface which are usually very difficult to repair and take a lot of time on the rig to repair.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3