Abstract One of PTTEP's joint operating company in MTJDA within the Gulf of Thailand has had the obligation to supply gas at its maximum capacity at all times and exploring the deeper territories is the only approach to acquire new reserves within the confined development area. This results in some complications both in drilling engineering and operation, which generally requires larger rig with higher day rate and more expensive technologies. After the operator successfully drilled and completed Muda-9, one of the deepest exploratory wells in term of vertical depth in Muda field, in 2011 with 7,500 psi rig, the operator intended to drill MDE-13, a development well of the same vertical depth, in reference to Muda-9 with a smaller rig of 5,000 psi capacity, having a long term contract with the operator. MDE-13 having a planned depth of 3,065 mTVD/4,207 mMD became the first 5 casing strings for the operator's development well with the highest pressure of approximately 1.85 SG or 8,200 psi at TD. To prepare for drilling MDE-13, there were several concerns during the well design stage relating to rig pump capacity, narrow margin between pore and fracture pressure, an extremely small hydraulic fracturing target, higher temperature, and strength of tubing cement. With the comprehensive well design and the use of proper equipment, however, the operator lessened the associated risks to the acceptable level and the actual drilling operation went well without any major down time. In fact, the normalized time taken to drill MDE-13 is approximately the same as the time taken to drill Muda-9 despite the utilization of smaller rig and much stringent directional control, resulting in the estimate cost saving of the rig day rate of approximately 1 MMUSD. The main objective of this paper is to present how the operator designed and drilled one of its most difficult wells successfully deep into the proximity of higher pressure and temperature environment with a relatively small rig and equipment limitation while maintaining the acceptable safety standards. The well design and practices of this development well are intended primarily for wells drilled in Gulf of Thailand area.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Development of Drilling Parameter Collaborative Optimization Software Based on Machine Learning;Springer Series in Geomechanics and Geoengineering;2023

2. Effects of Drill String Length on Stick–Slip Oscillation of the Oilwell Drill String;Iranian Journal of Science and Technology, Transactions of Mechanical Engineering;2019-01-25

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3