Abstract

Abstract It is well known that close quality assurance and quality control (QA/QC) are of vital importance for the successful placement of any hydraulic fracturing treatment. Many complex pieces of equipment and specialized personnel are involved in the fracturing process, and the following of strict QA/QC standards is mandatory to make these operations successful, efficient and safe. BP Oman is using massive hydraulic fracturing treatments to exploit the challenging tight-gas Barik Formation in the Khazzan and Ghazeer Fields. Each treatment is designed to place 1 million pounds of proppant into this tight, high pressure high temperature reservoir, leaving no space for error. Implementing QA/QC and logistic supply measures begins with the mobilization procedures: chemicals checklist/verification and mixing on the base, timely equipment maintenance, bulk plant proppant delivery to ensure a swift and smooth 24 hour operation. Water delivery management loading quality check, logistics, site acceptance and minimum quality checks are another important procedure related to this preparation. Each fracturing stage requires at least 14,000 bbl of fresh water to be available and quality checked on the site before the start of the fracturing treatments. Intensive QA/QC measures continue through the day of the fracturing treatment itself to ensure the equipment is in full working condition. Assurance that all of the supply systems are properly calibrated, all chemicals loaded and levels physically measured. During the fracture treatment itself all parameters are repeatedly measured and visualized in real time. Fluid viscosity is assessed on the fly and data verified with an HPHT viscosimeter also present on the wellsite. After the treatment, all remaining chemicals are measured once again and carefully assessed against the expected inventory values and material balanced. Implementing extensive QA/QC procedures enabled efficient mobilization between wells with mobilization time as low as 6 days despite the complex equipment and material needs for these massive fracturing treatments. Planned logistics and consistent quality checks before, during and after the treatment enabled BP Oman to successfully place more than 100 hydraulic fracturing stages with the amount of proppant exceeding 1 million pounds per stage. The bar has raised even higher with successful placement of 2 million pounds of proppant, the largest single stage hydraulic fracturing treatment in the Eastern hemisphere at the time of execution.

Publisher

SPE

Reference9 articles.

1. Stratigraphy of the Lower Paleozoic Haima Supergroup of Oman;Droste;GeoArabia,1997

2. Stimulation Engineering Handbook;Ely,1994

3. The tectonic evolution of interior Oman;Loosveld;Geoarabia,1996

4. Ghaba salt basin province and Fahud salt basin province, Oman – Geological overview and total petroleum systems;Pollastro;U.S. Geological Survey Bulletin,1999

5. Martins, J.P., Leung, K.H., Jackson, M.R., Stewart, D.R. and Carr, A.H. 1989. Tip Screen-Out Fracturing Applied to the Ravenspurn South Gas Field Development, presented at the SPE ATCE, San Antonio, Texas, USA, Oct 8-11, SPE 19766. http://dx.doi.org/10.2118/19766-PA

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3