Identifiability of Estimates of Two-Phase Reservoir Properties in History Matching

Author:

Watson A.T.1,Gavalas G.R.2,Seinfeld J.H.2

Affiliation:

1. Texas A and M.

2. California Inst. of Technology

Abstract

Abstract Since the number of parameters to be estimated in a reservoir history match is potentially quite large, it is important to determine which parameters can be estimated with reasonable accuracy from the available data. This aspect can be called determining the identifiability of the parameters. The identifiability of porosity and absolute parameters. The identifiability of porosity and absolute and relative permeabilities on the basis of flow and pressure data in a two-phase (oil/water) reservoir is pressure data in a two-phase (oil/water) reservoir is considered. The question posed is: How accurately can one expect to estimate spatially variable porosity and absolute permeability and relative permeabilities given typical permeability and relative permeabilities given typical production and pressure data" To gain insight into this production and pressure data" To gain insight into this question, analytical solutions for pressure and saturation in a one-dimensional (1D) waterflood are used. The following, conclusions are obtained.Only the average value of the porosity can be determined on the basis of water/oil flow measurements.The permeability distribution can be determined from pressure drop data with an accuracy depending on the pressure drop data with an accuracy depending on the mobility ratio.Exponents in a power function representation of the relative permeabilities can he determined from WOR data alone but not nearly so accurately as when pressure drop and flow data are used simultaneously. Introduction The utility of reservoir simulation in predicting reservoir behavior is limited by the accuracy with which reservoir properties can be estimated. Because of the high costs properties can be estimated. Because of the high costs associated with coring analysis, reservoir engineers must rely, on history matching as a means of estimating reservoir properties. In this process a history match is carried out by choosing the reservoir properties as those that result in simulated well pressure and flow data that match as closely as possible those measured during production. In general, reservoir properties at each gridblock in the simulator represent the unknown values to be determined. Although there are efficient methods for estimating such a large number of unknowns, it has long been recognized from the results of single phase history matching exercises that many different sets of parameter values may yield a nearly identical match of observed and predicted pressures. The conventional single phase predicted pressures. The conventional single phase history matching problem is in fact a mathematically illposed problem, which explains its nonunique behavior. Such a situation is, in short, the result of the large number of unknowns to be estimated on the basis of the available data and the lack of sensitivity of the simulator solutions to the parameters. Because of this lack of sensitivity, the need to reduce the number of unknown Parameters or to introduce some additional constraints, such as "smoothness" of the estimated parameters, has been recognized. A problem as important as that of choosing which minimization method to employ in history matching is that of choosing, on the basis of the available well data. which properties actually should be estimated. This selection properties actually should be estimated. This selection depends on the relationship of the unknown parameters to the simulated well data. Ideally one would want to knowwhich parameters can be determined uniquely if the measurements were exact, andgiven the expected level of error in the measurements, how accurately we can expect to be able to estimate the parameters. The first question, that of establishing uniqueness of the estimated parameters, is notoriously difficult to answer, and for a parameters, is notoriously difficult to answer, and for a problem as complicated as reservoir history matching, problem as complicated as reservoir history matching, there are virtually no general results available that allow one to establish uniqueness for permeability or porosity. Thus, it is not possible in general to base our choice of which parameters to estimate on rigorous mathematical uniqueness results. In lieu of an answer to Question 1, the selection of parameters to be estimated can be based on Question 2, parameters to be estimated can be based on Question 2, which is amenable to theoretical analysis. If the expected errors in estimation of any of the parameters, or any linear combination of the parameters, are extremely large, then that parameter or set of parameters can be judged as not identifiable. In such a case, steps may be taken to reduce the number of unknown parameters. In summary, the reservoir history matching problem is a difficult parameter estimation problem, and understanding the relationship between the unknown parameters and the measured data is essential to obtaining meaningful estimates of the reservoir properties. Quantitative studies regarding the accuracy of estimates for single-phase history matching problems have been reported by Shah et al. and Dogru et al. Shah et al,. investigated the optimal level of zonation for use with 1D single-phase (oil) situations. SPEJ P. 697

Publisher

Society of Petroleum Engineers (SPE)

Subject

General Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3