First Application for a Sequenced Fracturing Technique to Divert Fractures in a Vertical Open Hole Completion: Case Study from Saudi Arabia

Author:

Bartko Kirk1,Tineo Roberto2,Aidagulov Gallyam2,Al-Jalal Ziad2,Boucher Andrew2

Affiliation:

1. Saudi Aramco

2. Schlumberger

Abstract

Abstract A unique sequenced fracturing technique using formation notching and degradable diversion pills was applied for the first time in a vertical open hole completion to stimulate multiple pay intervals in a well in the "Q" sandstone formation of Saudi Arabia. The challenge to divert fractures in a vertical open hole is made more difficult by the large fracture surface area in contact with the wellbore. A robust, efficient and repeatable two-step technique was implemented to provide the diversion and controlled breakdown of higher-stressed sections of the interval. The first step used a specialized jetting nozzle to create circular notches and weaken the formation at target depths. The second step involved the pumping of a small volume of a composite fluid of degradable non-damaging fiber and particles that bridge at the fracture face, to divert the remainder of the treatment to under-stimulated sections of the interval. The target for this well was a shallower formation due to completion pressure limitations while fracturing. This left six pay intervals spread across the tight, heterogeneous sandstone layers of the Q formation, which was completed as a single 552-ft. vertical open hole section. Previous experience showed large stress variations in the layers with contained fractures, and fracturing all pay intervals required separate treatments for each interval. After notching the pay intervals to reduce breakdown pressures, the interval was fractured with three proppant ramps separated by two diversion pills in the span of 8 hours, improving efficiency by more than three times. Diversion was confirmed by: (1) pressure increases of 380 psi and 500 psi, respectively, when the pills landed on formation; (2) increasing trend of the instantaneous shut-in pressures (ISIP's) throughout the treatment, resulting in 1,270 psi of net pressure gain; and (3) comparison of post-diagnostic injection test temperature log data with post-fracturing neutron log data, showing where nonradioactive traceable proppant was placed, including into at least three pay intervals not broken down during the injection test. Post-treatment production expectations were met and confirmed with a well test. This paper will present the design, execution, and evaluation methodology and challenges overcome to divert hydraulic fractures in long vertical open hole intervals using this two-step diversion process for sequenced fracturing. The ability to do this consistently and predictably can provide a practical, efficient, and cost-effective preferred solution that does not exist today for completing and fracturing similar zones that are traditionally bypassed, resulting in increased production and reserves.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3