Evaluation of Rigless Water Shutoff Treatments To Be Used in Arab-C Carbonate Reservoir in Saudi Arabia

Author:

Al-Dhafeeri Abdullah M.1,Nasr-El-Din Hisham A.2,Al-Harith Abdullah M.1

Affiliation:

1. Saudi Aramco

2. Texas A&M University

Abstract

Abstract A multi-lateral oil-producing well A was killed due to excessive water production from Arab-C that is dumping into the Arab-D reservoir. Therefore, the communication between Arab-C and Arab-D where behind the expandable liner is urgently needed to be blocked. Several solutions were investigated in an attempt to stop this flow behind casing. This problem is always a challenging task for field operators. The effect of excess water production on the productive zone, Arab-D reservoir will be substantial in terms of changes in relative permeability of this zone and increased water saturation. This change in the reservoir behavior will result in reduction of well life. The dead well A is a valuable asset that needs to be effectively utilized throughout the producing life of the field. Therefore, remedial treatments to revive this well are of value in terms of strategic plan to maximize revenues. Although the rigless water conformance method in a multi-lateral oil-producing well is a difficult task to the oil companies because of reservoir heterogeneity, cross-flow, gel placement, and cost. Several options of water shutoff treatment are proposed to address remedial treatments for water conformance problems. The main objective of this study is to:Identify and characterize the source of produced water,Identify the chemical blocking agents that will flow through the water out zone, andidentify an effective technique to optimize the size and the placement of these chemicals. Challenges, design criteria, and field treatment evaluation are addressed in this paper. Introduction There are two general methods to minimize water production from Well A: rig workover and rigless operation using coiled tubing unit (CTU). Rig workover operations are very expensive, whereas the rigless operation using CTU is cost effective. A special procedure is needed for gelant placement to minimize the formation damage. The oilfield operator should rely on two distinct types of water production. The first type, usually occurring later in the life of a waterflood, is water that is co-produced with oil as part of the oil's fractional flow characteristics in reservoir porous rock. If the production of this water is reduced, oil production will decrease simultaneously. The second type of water production competes directly with oil production. This water usually flows to the wellbore by a path separate from that for oil (e.g., water coning or a high-permeability water channel through the oil strata). In the latter case, reduced water production can often lead to greater pressure drawdown and increased oil production rates. Obviously, the second type of water production should be the target of water shutoff treatments. Understanding and conceptualizing the reservoir is a key to:Distinguishing between the previous two types of water production.Successfully diagnosing the water production problem.Successfully implementing and designing water shut-off treatments.

Publisher

SPE

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3