Drilling Aspects of the Deepest Well in California

Author:

Shultz S.M.1,Schultz K.L.2,Pageman R.C.2

Affiliation:

1. Bechtel Petroleum Operations Inc.

2. U.S. DOE

Abstract

Abstract On May 30, 1985, an Exploratory Well 934-29R was spudded in the Elk Hills Naval Petroleum Reserve #1 at Tupman, California. Bechtel Petroleum Operations, Inc. and the Petroleum Operations, Inc. and the Department of Energy cooperated in a joint effort to drill a 25,000 foot well and determine whether or not hydrocarbons are present at the deeper depths. Several zones present at the deeper depths. Several zones of interest had been drilled through when the well reached a final T.D. of 24,426 feet (Figure #1). This paper will reveal some of the more significant drilling technology used and also problems encountered while drilling the deepest well in California. Points to be covered will include the Points to be covered will include the following:Casing Design to Accommodate 5" Drill PipeLVT Oil Base MudDiamond Bit DesignUtilization of TurbodrillsCementing Introduction In 1975, a decision was made by DOE to drill three deep test wells at Elk Hills (Figure #2). The first well was spudded in 1977. It was drilled to 18,270 feet and curtailed due to hole problems. The second well was spudded in 1978 and drilled to basement at 18,761 feet. These two wells were evaluated prior to designing a drilling program for prior to designing a drilling program for 934-29R. In the past, major hole problems were encountered due to the length of time reactive shales were exposed to a water base mud system. Sloughing would result and casing strings were run sooner than planned. Smaller drilling assemblies would then have to be run, giving rise to mechanical problems such as twist-offs and parted pipe. problems such as twist-offs and parted pipe. To alleviate this problem, one of the goals of 934-29R was to design the well with an adequate sized casing to permit the drilling of the entire well with 5" drill pipe. Casing Design The conductor pipe was 36" line pipe which was cemented at 71' prior to the rig moving on. The well was spudded with a 17-1/2" bit and drilled to 323 feet. A hole opener was then run and the hole was opened to 23 inches from 71 feet to 323 feet. A second larger hole opener was run, increasing the hole size to 32 inches for the same interval. At that time, 26", 278#/ft line pipe was run in 40' sections with welded pipe was run in 40' sections with welded connections and cemented in place at 323 feet. Drilling out the shoe of the 26" casing was done with a 14-3/4" bit and the hole was drilled to 2,836 feet. A hole opener was run and enlarged the hole to 23 inches. P. 453

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A New Environmental Friendly Oil-Based Drilling Fluid;Springer Series in Geomechanics and Geoengineering;2023

2. Rheological transition of an ethoxylated alkylamine emulsion induced by acetic acid and its application to drilling fluid;Colloids and Surfaces A: Physicochemical and Engineering Aspects;2019-04

3. Study on Harmless Technology of Waste Oil-Based Drilling Fluid;Advanced Materials Research;2012-05

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3